1.
Analysis on the Foundation Pit Construction Monitoring Technology in Open-Cut Construction in Subway
地铁车站明挖施工基坑监测技术与分析
2.
Subway Open-Cut Construction Technology;
北京地铁五号线蒲黄榆站东北风道明挖施工工艺技术
3.
Construction Techniques of The First Stage Open Excavation at Spillway Tunnel Outlet in Left Bank of Xiluodu Dam
溪洛渡水电站左岸泄洪洞出口一期明挖施工技术
4.
Technique for Deep Pit Construction with No-supported Dig
无支护式明挖扩大基础深基坑开挖施工技术
5.
Excavation Construction Technology and Its Application to Open Channel of Roadway in Aeolian Sand Formation
风积砂地层巷道明槽开挖施工技术与应用
6.
The Design and Construction of the Entrance to Subway Mined Tunnel from Deep Foundation Pit
明挖基坑内地铁矿山法隧道进洞的设计与施工
7.
The techniques of topdown construction method for air shaft of metro line
地铁中间风井超深基坑明挖逆作法施工技术
8.
Tunneling Techniques of Open Cut in close quarters for Step Over a Existing Shield Tunneling
明挖法隧道近距离跨越既有盾构隧道施工技术
9.
The application of anchor cable construction on deep foundation pit support
浅谈锚索施工在明挖深基坑围护中的应用
10.
The design and construction control of open excavation foundation changing shallow buried tunnel
明挖路基改浅埋隧道的设计与施工控制
11.
Study on the Design Optimization of the Fabricated Structure of the Subway Stationg Constructed by Open-Cut Method and the Mechnaical Behaviour of Construction;
明挖装配式地铁车站结构设计优化及施工过程力学特性研究
12.
APPLICATION OF ONE-SIDE FORMWORK SUPPORTING SYSTEM IN CONSTRUCTION OF OPEN-CUT SUBWAY STATION
单侧模板支撑体系在地铁明挖车站施工中的应用
13.
Security Evaluation of the Existing Metro Station Adjacent to the Foundation Pit of a New Metro Line
明挖基坑紧邻既有地铁施工的结构安全力学分析
14.
Analysis by Field Measurement on a Cut and Cover Railway Tunnel Excavation near Meilan Airfield in Hainan
海南东环铁路美兰机场明挖隧道试验段施工监测与分析
15.
Construction of Dragging Pipe under Complex Condition of Non-excavation
复杂施工条件下非开挖拖拉管的施工
16.
Cause of Artifical Dig-in-place Piles Failure and Summary Experience
人工挖孔桩施工常见问题及处理措施
17.
Application of Rotary Holing Construction in Overpass Project;
旋挖成孔施工在立交桥工程中的应用
18.
Constructionmethods of Artificial Digged-hole Pile Crossing Deep Silt Layer
人工挖孔桩穿越深淤泥层的施工方法