1.
The Positioning System for Lifting Instruments in Container Cranes;
集装箱桥吊吊具定位系统的总体设计
2.
The Research of Anti-Swing Control of Container Crane Based on T-S Fuzzy Model;
基于T-S模型集装箱桥吊防摇控制方法的研究
3.
X-Radiographic Detection and Common Defects Analysis on Welding Seam of Steel Construction of Container Crane
集装箱桥吊钢结构焊缝X射线检测及常见缺陷分析
4.
container marine line system
集装箱搬运吊车方式
5.
lift onlift off vessels
吊进吊出集装箱装卸船舶
6.
combined roll-on/roll-off,lift-on/lift-off containership
滚装和吊装两用集装箱船
7.
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工
8.
Construction control of Huai'an Beijinglu Bridge
淮安北京路大桥钢箱梁吊装线形控制
9.
Study on Lifting Device for Heavy Vehicles for Container Crane
集装箱起重机吊装重型车辆用吊具研究
10.
Lo-Lo carbulk carrier
集装箱吊装、汽车和散货多用运输船
11.
Specifications of spreader for 5D freight containers
GB/T12420-19905D型集装箱吊具技术条件
12.
The New Way of Power-Saving and Consumption-Reducing for the Rubber Tired Gantry(RTG) in the Port;
港口集装箱轮胎吊节能减排的新途径
13.
The Real-Time Positioning & Controlling System for RTG in Container Terminal;
集装箱堆场轮胎吊实时定位控制系统
14.
Modification of the rotation hydraulic system of the ELME817 container spreader
对ELME817型集装箱吊具液压系统的改进
15.
The Line Shape Control of Ateel Box Arch Rib of External Slanted Arch Brigdge;
外倾式钢箱拱桥扣索吊装拱肋线形控制
16.
Analysis of Temporary Bracket under Construction of Steel Box Girder Hoisting in Sutong Bridge;
苏通大桥钢箱梁吊装临时支架结构分析
17.
Research on Erection and Installation of 195m Span Box Reinforced Concrete Arch Bridge;
195m钢筋混凝土箱形拱桥吊装施工技术研究
18.
The Construction Controlling of Long-span Box Arch Bridge Erecting with Cable Way;
大跨度箱形拱桥缆索吊装施工过程监控