1.
Engineering Geological Conditions of Tunnel Passage (East Line) between Shanghai and Chong Ming
沪崇越江通道(东线)工程地质条件
2.
The Impact Analysis of Yangtz River Outlet Passage Construction on District Development;
长江口越江通道建设对区域发展的影响
3.
The Impact Analysis of Yangtz River Outlet Passage Construction on Metropolis Development;
长江口越江通道建设对城市群发展的影响分析
4.
Technique & Economy Comparative Analysis and Empirical Research on Qiantang River Bridge and Tunnel Plan;
钱塘江越江通道桥隧方案技术经济比较分析及实证研究
5.
Studies on the land banking mechanism & investment and compensation for Chongming Bridge & Tunnel Project;
崇明越江通道工程投融资与土地储备机制相结合的研究
6.
The Influencing Factor of the Temperature Field of Cross-passage Construction by Freezing Method in Double-Deck Road Tunnels
双层越江隧道联络通道冻结法温度场影响因素
7.
Cross-River Tunnel Ventilation Control Model and Ventilation Control Strategies Research;
越江隧道的通风控制模型及控制方法研究
8.
Numerical Simulation Study on the Combined Fire Ventilation in Crossing-River Tunnel;
组合通风方式越江隧道火灾的数值模拟
9.
Study on the Ventilation and Disaster Prevention of Urban River Highway Tunnel Services Layer
城市越江公路隧道服务层通风及防灾研究
10.
On Application of Semi-transverse ventilation in South Xizang Rd. Cross-river Tunnel
半横向通风在西藏南路越江隧道中的应用
11.
The ground has been Broken for the cross- river tunnel
越江隧道已破土动工
12.
The path cuts the meadow diagonally.
通道斜斜地穿越草原。
13.
The wider the bus, the more data it can move at one time.
通道越宽,同一时间传输的数据就越多。
14.
With concrete measures adopted, the pipeline crossing with directional drilling technique in rocky stratum of middle reaches of Yangtse River succeeded for the first time.
通过具体实施,在长江中游岩石层中首次采用水平定向钻技术穿越原油管道获得成功。
15.
Construction Technology of Ganjiang River Crossing of Gas Pipeline Installed along Bridge
随桥敷设跨越赣江燃气管道施工技术
16.
Study on the Longitudinal Anti-bending Capacity of Nanjing Cross-river Shield Tunnel
南京越江盾构隧道纵向抗弯能力研究
17.
Allround analysis of construction treatment technology for some tunnel in karst cave
浅析某越江隧道工程岩溶的处理措施
18.
Engineering Monitoring for Yangtzi River Tunnel Crossing Project of Anqing Gas Transmission Pipeline
川气东送管道安庆长江隧道穿越的施工监测