说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 浅埋双连拱隧道
1.
The Reasons of Geological Disaster and Treatment Measures for a Shallow Buried Double-Arch Tunnel
浅埋双连拱隧道地质灾害成因分析与整治对策
2.
Optimization Study on the Initial Support Parameters of the Shallow Depth of the Road Double-arch Tunnel;
双连拱隧道浅埋地段初期支护参数优化研究
3.
Research on the Monitoring Technology of Information Construction for the Shallow Buried Double-Arched Tunnel under Unsymmetrical Pressure
浅埋偏压双连拱隧道信息化施工监测技术研究
4.
On the large-span and double-arch tunnel construction of the shallow-buried surrounding rocks on highways
高速公路软弱围岩浅埋大跨度双连拱隧道施工
5.
Construction Technology and Mechanical Behavior Study on Twin-Arch and Double-Deck City Tunnel of Low-Burying;
城市浅埋双连拱双层隧道施工技术及力学行为研究
6.
Study and Application of Construction Method of Double Multi-arch Tunnel in Complicated Geologic Condition;
复杂地质条件下双连拱浅埋隧道施工技术研究及其应用
7.
Study on Construction Mechanics of Twin-arch Tunnel in Shallow and Bias Rocks under Yulingguan Antique City-wall;
昱岭关古城墙下浅埋偏压双连拱隧道施工力学研究
8.
Optimal Analysis of Excavation Sequence and the Structure of Shallow, Unsymmetrical Pressure, Twin-arch Tunnels;
浅埋偏压连拱隧道开挖顺序与结构优化分析
9.
Study on Stability of the Doubled-arch Tunnel in the Shallow Slanting Cover;
浅埋偏压软弱围岩连拱隧道稳定性研究
10.
Research on the Mechanical Behavior of Unsymmetrical Loading Twin-arched Tunnels Located on the Shallow Weak Rock Mass;
软弱围岩浅埋偏压连拱隧道力学效应研究
11.
Study on Construction Mechanics Effect of Shallow-buried Loess Double-arch Tunnel under Unsymmetrical Pressure
浅埋偏压黄土连拱隧道施工力学效应研究
12.
The Numerical Simulation Analysis of First Hole for Shallow Bias-Arch Tunnel
浅埋偏压连拱隧道先行洞数值模拟分析
13.
The Fast Detective Technology of Shallow Buried Large Span Multi-arch Tunnel Constrution
浅埋大跨径连拱隧道施工快速检测技术
14.
The Application of Sallow Buried Tunneling Method in the Construction of Continuous Arch Tunnel Undergoing Railway
浅埋暗挖法在下穿公路连拱隧道施工中的应用
15.
The Construction Technology Discussion of Huangmeishan Twin-arch Tunnel under the Condition of Large Span, Low-burying and Soft Surrounding Rock;
浅埋大跨软弱围岩连拱隧道—黄梅山隧道施工技术探讨
16.
Discussion on CRD Method for Highway Tunnel with Double Continuous Spans
浅谈公路双跨连拱隧道中隔墙施工技术
17.
Three-D Mechanical Effect Analysis of Heavy Load over Shallow Buried Large Span Multi-arch Tunnel in Construction Process;
浅埋重载大跨径连拱隧道施工过程空间力学效应分析
18.
Interaction and Stability Study on Shallow Part Surrounding Rock and Slope of Double-Arch Tunnel;
连拱隧道浅埋段边坡与围岩相互作用机理及稳定性研究