1.
Stability Analysis Against Deep Sliding of the Dam Foundation of Two Dam Section for Xiangjiaba Hydropower Station;
向家坝水电站两个坝段坝基深层抗滑稳定分析
2.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
3.
Investigation on stability against deep level sliding of Xiangjiaba hydrostation gravity dam
向家坝水电站重力坝深层抗滑稳定性研究
4.
Dam Partition Temperature Control for Left Bank of Xiangjiaba Hydropower Station
向家坝水电站左岸坝体分缝温度控制研究
5.
Installing Technique of A Style Tower Cable Crane for Xiangjiaba Hydropower Project
向家坝水电站A型塔架式缆机安装技术
6.
A study of the Reservoir Tourism Planning--A Case of Xiangjiaba
库区旅游开发研究——以向家坝为例
7.
Simulation and Optimization on the Dam Construction Schemes of Xiangjiaba Hydropower Station;
向家坝水电站大坝浇筑施工方案仿真分析与优化设计
8.
Dynamic Three-Dimension Visual Simulation for Xiangjiaba Hydroplant Dam Concrete Construction;
向家坝水电站大坝施工动态三维可视化仿真研究
9.
Analysis of anti-sliding stability in deep foundation of Xiangjiaba gravity dam based on interface element method
基于界面元法的向家坝重力坝深层抗滑稳定分析
10.
Surrounding Rock Stability Analysis and Support Design Study for Xiangjiaba Underground Powerhouse;
向家坝地下厂房围岩稳定分析和支护设计研究
11.
Study on Simulation and Optimization for the Construction Diversion Process of Xiangjiaba Hydropower Station;
向家坝水电站施工导流过程仿真与优化研究
12.
Research on the Stability of High Slope of the Intake of Xiangjiaba Hydropower Station;
向家坝水电工程进水口高边坡稳定性研究
13.
Dynamic Visualization Construction Diversion of XiangJiaBa Hydroplant;
向家坝水电站施工导流动态可视化研究
14.
Influence of Xiangjiaba Dam Project Construction on Yibin Economic Envelopment and Countermeasure;
向家坝工程建设对宜宾经济发展的影响及对策
15.
Application of composite geomembrane in Xiangjiaba earth-rock fill cofferdam
复合土工膜在向家坝围堰工程中的应用
16.
Resistance Monitoring in Construction of Caisson Foundation of Cofferdam of Xiangjiaba Hydropower Station
向家坝水电站围堰基础沉井施工下沉阻力监测
17.
Curtain Grouting Test at Underground Powerhouse at Right Bank of Xiangjiaba Dam
向家坝水电站右岸地下厂房帷幕灌浆试验
18.
Cavern Excavation Method for Underground Powerhouse Complex at Xiangjiaba Hydropower Station
向家坝电站地下厂房系统洞室开挖方法