1.
Study on Peak Load Modulation Model Based on Tou Price in Hydropower Plant
基于分时电价的水电站调峰模型研究
2.
Peak-Load Regulation and Emergency Response Function of Weekly Adjusted Pumped Storage Station in Beijing-Tianjin-Tangshan Power Grid;
周调节抽水蓄能电站在京津唐电网中的调峰与事故响应作用
3.
Functions of Peak Regulation & Frequency Modulation of Geheyan Hydropower Station in Hubei Grid & Central China Grid;
隔河岩水电站在湖北、华中电网中的调峰调频作用
4.
Study of short-term optimal dispatch models for cascade hydropower stations based on peak/valley output restrictions of power grids
电网峰谷出力比约束下的梯级水电站短期优化调度模型研究
5.
Research on Operation Practice of LNG Pressure Vaporizing and Peak-shaving Station
LNG加压气化调峰站运行实践的研究
6.
Research on Economic Characteristic of Regulating Peak Load on Time for Turbine Units Based on the EDTHRIT and the EPM
结合等微增原理与正多面体法对电站汽轮机组调峰实时经济承载特性研究
7.
Application of Computer Monitoring and Control System of Zhangfeng Reservoir’s Headwork Hydroeleciric Station,Pumping Station and Chuanpo Hydroelectric Station
张峰水库渠首电站及泵站和川坡水电站计算机监控系统应用
8.
Evaluation and incentive mechanism of peaking capability of hydroelectric/thermoelectric generators
水电/火电机组调峰能力的评估与激励
9.
Interconnection electricity prices of peak regulation and frequency regulation power plants in regional electricity markets;
区域电力市场应急调峰调频电厂上网电价研究
10.
On the Lightning Protection and Grounding Design for Chuanpo Hydropower Station of Zhangfeng Reservoir
浅析张峰水库川坡水电站防雷保护与接地设计
11.
Introduction of automatic dam safety monitoring system at Yunfeng hydropower station
云峰水电站大坝安全监测自动化系统简介
12.
Design of deformation monitoring and its monitoring data of Yunfeng dam
云峰水电站大坝变形监测设计及监测成果
13.
The Research on the Peak Regulating Modes of Homemade 300MW Fossil-fired Unit;
国产300MW火电机组调峰方式的研究
14.
Strategies for tire production after readjusting the electricity price in peak and low period;
峰谷电价调整后轮胎生产的应对策略
15.
Analysis on the Operation of Electric Power Plants of Gas Fuel and NG Peak Shaving;
浅析上海燃气电厂运行与天然气调峰
16.
Talking about the Concrete Quality Control of Canal Head Power Station and Canal Head Pump Station of Zhangfeng Reservoir Project
浅述张峰水库工程渠首电站和渠首泵站的混凝土质量控制
17.
Design of natural gas liquefying apparatus for gas peak regulation and urban pressure regulating stations
用于燃气调峰和城市调压站的天然气液化装置设计
18.
Air-conditioning with Ice Accumulation of Cold Influence on Peakload Regulationin Nanjing Network;
冰蓄冷空调技术对南京地区电网调峰的影响