1.
To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.
为了降低土方工程的费用,填方量应等于挖方量。
2.
The Slope of Guishan Stability Analysis and Optimization Comparison of Several Excavation Programs;
龟山滑坡体稳定分析及开挖方案优化
3.
The Technique of Confident Rule Mining in Data Mining;
数据挖掘中可信规则挖掘方法的研究
4.
a mine where copper is dug from the ground.
从地面挖掘铜的地方。
5.
This project involved 400000 cubic metres of earthwork.
这项工程要挖40万土方。
6.
balanced earthworks
填挖平衡的土方工程
7.
We dug up 180 cuBic metres of earth.
我们挖了180 立方米的土。
8.
The gemstones mined here are superior to the ones mined elsewhere.
这里挖掘出的宝石优于其它地方挖掘出的宝石。
9.
The Universal Digging Performance Research of Face-shovel Hydraulic Excavator;
正铲液压挖掘机挖掘性能通用分析方法研究
10.
Studies and Applications of Association Rule Mining Methods in Data Mining;
数据挖掘中关联规则挖掘方法的研究及应用
11.
Development of Auto-Tracing Dividing Line of Earthwork Based on CASS
基于南方CASS的挖填方0界线自动追踪
12.
Hydraulic excavators-Test methods for reliability
GB/T10675-1989液压挖掘机可靠性试验方法
13.
Hydraulic excavators-Testing method of structure strength
GB/T9141-1988液压挖掘机结构强度试验方法
14.
It consists of a card with slots cut in it.
这是一种上面挖了数个方格的卡片。
15.
This winter, another 850 to 1000 million cu.m.will be dug.
今年冬天我们还要挖8。5到10亿土方。
16.
hollow out in the form of a furrow or groove.
以犁沟或开槽的方式来挖掘。
17.
Testing method of hydraulic excavators
GB/T7586-1996液压挖掘机试验方法
18.
Hydraulic excavators-Methods of measuring lift capacity
GB/T13331-1991液压挖掘机起重能力测试方法