说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 贵溪工程
1.
Enhancement of Management in Entrustment System and Priority in Reform for Guixi Project;
贵溪工程独占改革先机 委托制管理志在更强
2.
Practice in Engineering Management of Technical Renovation of Guixi Smelter Copper Smelting System;
贵溪冶炼厂铜冶炼系统技术改造工程管理实践
3.
REBUILT C~3I SYSTEM AND IMPROVE QUALITY OF MANAGING FINANCIAL AFFAIR TO MAKE JIANGXI COPPER COMPANY BECOME THE FIRST GRADE INTERNATIONAL MINING COMPANY;
贵溪冶炼厂三期扩产工程决策思路和建设方案
4.
ANALYSIS ON PERFORMANCE TEST OF PHASE II FIRST STEP CONSTRUCTION IN GUIXI SMELTER;
贵溪冶炼厂二期一步工程性能考核结果分析
5.
The Benefit Evaluation of Natural Forest Protection Project in Hua Xi District of Guiyang City
贵阳市花溪区天然林保护工程效益评价
6.
Some Problems in the Design of Arch Dam on Liu-Hsi-Ho
论流溪河工程拱?紊杓浦械娜舾晌侍
7.
Study on Programming Scheme for Flood Control in Nanxi River, Yongjia County;
永嘉县楠溪江防洪工程规划方案研究
8.
Hydro-power Project of First Level in Pingnan, Fujian Province;
福建省屏南县后垄溪一级水电站工程
9.
Hydraulic Characteristics of Auxiliary Energy Dissipater and its Application in Grounding Design of Tuoxi Hydropower Station Extension Project in Hunan Province
湖南省柘溪水电站扩建工程接地设计
10.
A Design Plan of Comprehensive Treatment for Zhu-e Creek in Liuzhou
柳州市竹鹅溪综合治理工程设计方案
11.
Fluid Transient Process for the Planyan River Delivery Water System of Guizhou Yaxi Power Station;
贵州鸭溪电厂偏岩河输水系统水力过渡过程研究
12.
The Perplexities and Policy Guidance in the Urbanization Process in Guizhou --The Case Study of "Huaxi Phenomenon;
贵州城市化进程中的困惑与政策导向——“花溪现象”的个案透析
13.
Program and Research on Industrail Enterprise and Sustainable Development;
工业企业可持续发展对策研究——以贵溪冶炼厂为例
14.
Sewage Pipe Construction Technology of D4 Section in Qingshui Creek Pollution Control Project
清水溪治污工程D4标段排污管道施工技术
15.
An Experimental Study of the Hydraulic Models of the Sluice in Nanxi River Water Supply Projects
楠溪江供水工程拦河闸枢纽水工模型试验研究
16.
Immigrant s Risk of the Reservoir is Assessed--Take Immigrant s Project of Shanxi as an Example;
水库移民风险评估——以珊溪水库移民工程为例
17.
Post Evaluation of Benxi's 220kV Xiaoshi Power Transmission & Transformation Project
本溪220千伏小市输变电工程后评价研究
18.
River water diversion project is a tunnel cave-a number of issues and countermeasures
一都溪引水工程隧洞塌方若干问题及对策