说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 实施路线
1.
Data management model of ship production design and it’s implementation
船舶生产设计数据管理模型及其实施路线
2.
Route Chart for Following a Strategy "Diversification of Resources" in China;
中国实施“资源多元化”战略的路线图
3.
The Study on the Lightning Protection Performance of 110 kV Transmission Line
110kV输电线路防雷措施的实验论证
4.
Practice of 35kV Power Line Road Preventing the Thunder Measure Improvement
35kV输电线路的防雷措施改进实践
5.
Practical Integrated Lightning Protection Measures for Lightning-damage-free Transmission Line
无雷害输电线路的实用综合防雷措施
6.
Exploration on the Construction Plan of Railway Overhaul and Ballast Screening Across More Than One Railway Administration and the Implementation;
跨局进行线路大修清筛施工方案的探讨与实施
7.
Implementation of Railway Profile System for uplifting and renovating track
起道整修施工铁路线路纵断面设计系统的实现
8.
A NEW FEEDSTOCK LINE FOR RESIDUAL OIL TYPE LARGE CHEMICAL FERTILIZER BY USING GAS INSTEAD OF RESIDUAL OIL;
实施"油改气" 开辟渣油型大化肥新的原料路线
9.
How to Carry Out the Supervisiong in the Local Telecom Network Construction;
浅谈工程监理在本地网通信线路工程中的实施
10.
The Research on Safety Enhancement Project Practice Technology on Arterial Highway in Gansu Province
甘肃省干线公路安全保障工程实施技术研究
11.
Research and implementation on reactive power optimization intelligent system for 10 kV distribution line
10kV配电线路无功优化智能系统的研究与实施
12.
The Pathway to Implement Separation of Revenue and Expenditure Budgets (SREB) in Community Health Service (CHS) Institutions
社区卫生服务机构收支两条线管理的实施路径
13.
Analysis of 110 kV line single-phase grounding fault and improvement measures
110kV线路单相接地故障实例及改进措施的分析
14.
Construction Practice of 550kV Power Transmission Line Long-span over Yellow River
500kV输电线路黄河大跨越塔基工程施工实践
15.
Application of overall elevation scheme of 220 kV straight tower with double circuits
220kV双回路直线铁塔带电整体升高方案实施
16.
Design and Implementation of GPS Control Survey Network for Coal Mine Special Railway Lines of Zhaogu No.1 Coal Mine
赵固一矿铁路专用线GPS控制网的设计与实施
17.
Construction Technology Program Selection and Implementation of Pavement's Overhul and Intermediate Engineerings at Xiuyan-Haicheng Section on Dapan Line
大盘线岫岩—海城段路面大中修工程施工技术方案的选择与实施
18.
Since April 1997, Chinese railways have raised speeds three times to meet the needs of the market.
为适应市场需求,中国铁路在"九五"期间先后三次对既有线实施提速。