1.
For the main part of the system can be integral loop system.
主要用于开环系统,也可组成闭环系统.
2.
open-cycle reactor system
开式循环反应堆系统
3.
opened recirculation cooling water system
敞开式循环冷却水系统
4.
Judging the Stability of the Closed-Loop System by the Loop-Line on an Open-Loop Amplitude-Phase Characteristic Curve
按开环幅相特性上的环线判断闭环系统稳定性
5.
Complex system development occurs under chaotic circumstances.
复杂的系统开发发生于混乱的系统环境中。
6.
The Developmental Study of Thermal Power Plant Environmental MIS;
火电厂环境管理信息系统的开发研究
7.
Open CNC System Software Method Based on Win2000 Operating System;
Win2000环境下开放式CNC系统的软件方法
8.
The Development on Parameterized CAD System of Three-ring Gear Reducer;
三环减速器参数化CAD图形系统开发
9.
The Exploitation of the Drawing Course Learning System under the Web;
Web环境下制图课程学习系统的开发
10.
Hydraulic System CAD Environment Development and Design Method Research;
液压系统CAD环境开发与设计方法研究
11.
Research and Development of Mushroom House Envirowment Parameters Control System;
菇房环境参数控制系统的研究与开发
12.
Development of Intelligent Monitoring and Controlling System for Greenhouse Environment;
温室环境智能监控系统的开发与研究
13.
Development of Numerical Control Simulating System Based on Virtual Reality;
基于虚拟环境的数控仿真系统的开发
14.
Research and Development of 3D-CAPP under the Environment of Pro/ENGINEER;
Pro/ENGINEER环境下的三维CAPP系统研究与开发
15.
Development and Integration of CRM System Base on VPN Environment;
VPN环境下CRM系统的开发与集成
16.
Design and Implementation of Development Environment of Fuzzy Intelligent System;
模糊智能系统开发环境的设计与实现
17.
Web Software System Based on .NET;
基于.NET环境开发Web应用系统的研究
18.
The System Dynamics Analysis on Circular Economy System of TEDA;
泰达开发区循环经济系统动力学分析