1.
Triaxial Tests and Finite Element Analysis of Geobelt Reinforced Crushed Gravel Cushion;
土工带加筋碎石垫层的三轴实验与有限元分析
2.
Experimental Research and Finite Element Analysis of Geobelt-reinforced Gravel Cushion;
土工带加筋碎石垫层的试验研究与有限元分析
3.
Industrial [I] [land use zone]
工业〔土地用途地带〕
4.
Industrial (Group C) [I(C)] [land use zone]
工业(丙类)〔土地用途地带〕
5.
Industrial (Group D) [I(D)] [land use zone]
工业(丁类)〔土地用途地带〕
6.
Industrial (Group B) [I(B)] [land use zone]
工业(乙类)〔土地用途地带〕
7.
Industrial (Group A) [I(A)] [land use zone]
工业(甲类)〔土地用途地带〕
8.
On constructional method of replacing after pouring area with expansion to strengthen area of concrete
浅谈混凝土膨胀加强带代替后浇带的施工方法
9.
The measures of concrete late poured band and expansive reinforce tape in construction
混凝土后浇带及膨胀加强带在施工中的措施
10.
On Excavation Construction Technique of Soft Soil Foundation Pit with Super Deep Foundation "Pit-in-pit"
带有超深坑中坑的软土基坑挖土施工技术
11.
Tom: Do you want to take some local products and handicrafts?
汤姆:你想带一些土特产和手工艺品吗?
12.
To make holes in(soil)with a pointed implement.
用挖穴器挖用带尖的工具在(土中)
13.
Design and construction of late poured band of the super long concrete structure
超长混凝土结构后浇带的设计与施工
14.
Discussion on concrete late poured band design and construction of building construction engineering
房屋建筑工程混凝土后浇带的设计与施工初探
15.
STUDY ON SOIL RESPIRATION OF LARCH PLANTATION AT THE TRANSITIONAL ZONE FROM WARM TEMERATE TO MIDDIE TEMPERATE
暖温带-中温带过渡区落叶松人工林土壤呼吸特征研究
16.
Laying of bar strip of reinforced earth retaining wall for Dali Special Railway
大理铁路专用线加筋土挡墙筋带铺设施工技术
17.
Experimental Study on Engineering Properties of Slip Soils of Landslides along G212 Highway in Longnan;
G212线陇南段滑坡滑带土工程特性试验研究
18.
Soil Respiration of Temperate Secondary Forest and Larix Gmelinii Plantation in Northeastern China;
东北温带次生林与落叶松人工林的土壤呼吸