说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 洞室施工
1.
Construction Technology of Shallow Buried Wide Span Tunnel Adjacent to Building in Loose Ground Containing Water
松散含水地层邻楼房大跨浅埋洞室施工技术
2.
The Reliability Analysis of the Big Underground Cavities in the Construction;
大型地下洞室施工过程中的可靠性分析
3.
IMPROVEMENT AND APPLICATION OF ANN METHOD IN STRESS AND DEFORMATION PREDICTIONS DURING TUNNEL EXCAVATION
神经网络方法在洞室施工期应力及变形预测中的应用及其改进
4.
INFLUENCE OF BLASTING ON EXCAVATION OF A NEW TUNNEL ADJACENT TO EXISTING TUNNEL
相邻洞室爆破施工对已有洞室的影响
5.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
6.
Research on Ventilation for Large Scale Underground Cavity Groups Construction;
大型地下工程洞室群施工期通风研究
7.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
8.
Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;
构皮滩电站地下洞室群施工特性研究
9.
Excavation and Construction of Extra Large Caverns at Longtoushi Hydropower Station
龙头石水电站特大洞室开挖施工技术
10.
Some Technical Innovation of Concrete Construction of the Caverns of Xiaowan Hydropower Project
小湾水电工程洞室混凝土施工的一些技术创新
11.
Construction technique for excavation and support of chambers and tunnels under unfavorable geological condition
不良地质条件下的洞室开挖及支护施工技术
12.
Research on System Simulation Theory and Application for Construction Processes of Large-Scale Underground Structure Group;
大型地下洞室群施工系统仿真理论与应用研究
13.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
14.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
15.
Real-Time Control for Construction Scheduling of Large Scale Underground Structure Group;
大型地下洞室群施工进度实时控制研究
16.
Computer programming in calculation of large cavity surrounding rock by constructing stages;
大型洞室围岩计算中分期施工计算机程序处理
17.
Feedback Analysis Based on Monitoring of the Caverns Excavation of Underground Hydropower Plants
水电站地下厂房洞室群施工监测反馈分析
18.
Three Dimensional Numerical Simulation Analysis on Underground Powerhouse Complex Construction
地下厂房洞室群施工过程的三维数值模拟分析