说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙抬头泄洪洞
1.
Study on Air Entrainment to Alleviate Cavitations for Downstream Sidewalls of Ogee Section in Spillway Tunnel;
龙抬头泄洪洞反弧段下游侧墙掺气减蚀研究
2.
Model Test and Turbulence Numerical Simulation on the Dragon-Raise-Head Free Flow Spillway Tunnel with High Head;
高水头龙抬头泄洪洞掺气减蚀试验研究及数值模拟
3.
The Finite Element Dynamic Analysis of the Diversion Spillway Tunnel Flip Bucket Joint Section of Yunlong Water Reservoir
云龙水库导流泄洪洞龙抬头接合段有限元动力分析
4.
3-D Numerical Simulation on Flood Discharge Tunnel with High Water Head and Free Water Surface;
高水头明流泄洪洞三维数值模拟研究
5.
Numerical Study on Configuration Optimization of High Head Large Flood Discharge Tunnel
高水头大流量泄洪隧洞体型优化数值模拟研究
6.
Research Flood Releasing Safety of Flood Discharge Structure with High-head & Large-discharge
高水头大流量泄洪建筑物的泄洪安全研究
7.
Aseismatic Analysis and Optimization Design for Inlet of Diversion Tunnel;
导流泄洪底洞进口段抗震及优化分析
8.
Talking about the Engineering Geological Condition of Spillway Tunnel of Qianian Reservoir and Its Evaluation
千年水库泄洪洞工程地质条件及评价
9.
Design and Research on Flood-Discharge Power-Generating Hole of Baiyekou Reservior
柏叶口水库泄洪发电洞的设计与研究
10.
Shape optimization test of Dabeigou spillway reservior desilting tunnel
大北沟水库泄洪排沙洞体型优化试验
11.
Research and design for the transition section of the flood discharge tunnel with pressure
有压泄洪隧洞出口渐变段设计与研究
12.
Research on Hydraulic Characteristics of Reconstructing Diversion Tunnel to Permanent Spillway Tunnel;
导流洞改建泄洪洞衔接段水力特性研究
13.
On Some Hydraulie Problems in Water Tunnelsof High Tailings Dams
高尾矿坝泄洪洞若干水力学问题的探讨
14.
Controlled demolition blasting technology for thin reinforced concrete wall of a flood discharging tunnel
泄洪洞钢筋砼高薄边墙切割拆除控制爆破技术
15.
Evaluation on slope stability of a hydroelectric station spillway,Lancang River
澜沧江某水电站泄洪洞出口边坡稳定性评价
16.
Experimental Investigation and Numerical Simulation of Cavitation Inception in Flood-Discharge Tunnel with Orifices;
孔板泄洪洞空化初生试验及数值模拟研究
17.
Analysis of the Stability of the Slope of the Outlet Section of Spillway Tunnel of Luding Hydropower Station;
泸定水电站右岸泄洪洞出口边坡稳定性研究
18.
3D Finite Element Analysis of Spillway Chamber by ANSYS;
基于ANSYS的泄洪洞出口闸室三维有限元分析