说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 预埋件构造
1.
Experimental study on the seismic behavior of embedded anchors for the single-plate connection between steel truss and concrete wall
钢桁架与混凝土墙间单剪板连接预埋件构造形式的抗震性能试验研究
2.
Construction of the Large Built-in Fitting for the Deep Beam Structure of Concrete Frame
混凝土框架深梁结构大型预埋件施工
3.
New welding technology of embeded parts in the national stadium-submerged arc stud welding
国家体育场预埋件的焊接新工艺——埋弧螺柱焊
4.
Experimental Study and Research on Mechanical Properties of Rigid Polyvinyl Chloride Embedded Part;
硬质PVC预埋件力学性能试验与研究
5.
Development of Advance Geological Forecast Software for Super-long and Deep Tunnels
长大深埋隧道超前地质预报软件开发
6.
Analyse on the Reservoir-Formation Condition and Predictions of Favorable Structure Zone in the Huizhou Sag;
惠州凹陷油气成藏条件分析及有利构造带预测
7.
Research of Ore-controlling Structure and Metallogenic Prediction in Dongshan Scheelite Mine of Hunan
湖南东山钨矿控矿构造条件及成矿预测研究
8.
Measures of quality controlare introduced m ainly in the aspects of m anufacture and installation of em bedded parts,invisible-fram e structure construction,lightning and fire protection and glass installa- tion.
主要从预埋件制作安装、隐框架结构施工、防雷防火及玻璃安装等方面介绍质量控制措施
9.
Check up with built-in pipe& hole& so on as per drawings during civil construction.
依据图纸设计检查土建的予埋件预留空洞.
10.
Design Method of the Headed Stud Embedded at the Pinned Joint of Steel Beam to Concrete Wall
钢梁-混凝土墙铰接节点栓钉预埋件的设计计算
11.
Experimental Study on Mechanical Behavior of Big-Diameter Anchor Bar Embedded Part;
大直径锚筋预埋件力学性能的试验研究
12.
Reconstruction of Coal Mining Method for Shallow Mining Depth Seam in Nalinmiao No.2 Mine
纳林庙二号井浅埋煤层条件下采煤方法改造
13.
Effect of investment for titanium crown and bridge on reactive layer of castings
纯钛冠桥铸造包埋料对铸件反应层的影响
14.
Study on the Members of the Shallow Buried Underground Protective Structure and the Effects of the Buffer Isolated Layer;
浅埋地下防护结构构件及缓冲隔层作用研究
15.
Analysis and Forecast on Stability of Local Rock Blocks with Complex Structures during Large-scale Underground Excavation
复杂构造条件下大型地下工程开挖局部不稳定块体分析与预测
16.
Research on Deformed Shape Monitoring for Composite Structures with Embedded Componets
埋植元件的复合材料结构变形监测技术研究
17.
Crack Arrest of Half-embedding Cracks of In-service 45 Steel Component by Electromagnetic Heating
在役45钢构件半埋藏裂纹的电磁热止裂
18.
Research on Structure Options Adaptable for Metro Stations Constructed by Shield Tunneling Combined with Shallow Mining Excavation
盾构法与浅埋暗挖法结合建造地铁车站技术的结构方案初步研究