1.
The Three Gorges Project on the Yangtze River and the Xiaolangdi Project on the Yellow River successfully completed damming.
长江三峡和黄河小浪底工程成功截流。
2.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
3.
Study on Prestent Situation of Plant Resources in the Yellow River of Xiaolangdi Spot
黄河小浪底风景区植物资源现状研究
4.
Regulation of density flow routing of Xiaolangdi reservoir in Yellow river
浅析黄河小浪底水库异重流演进规律
5.
Sidelights on the first successful experiment with water and silt regulation at the Xiaolangdi key water-control project on the Yellow River
黄河小浪底首次成功调水调沙试验侧记
6.
Study on Seepage in the Dam Base of Xiaolangdi Project on Yellow River;
黄河小浪底水利枢纽工程大坝坝基渗流分析
7.
Study on the Tourism Environmental Capacity of Water Beauty Spot;
黄河小浪底水库风景区旅游环境容量研究
8.
Project claim and claim processing during construction of Xiaolangdi Water Control Project on Yellow River;
黄河小浪底水利水电工程索赔及其处理
9.
The research on Yellow River Xiao langdi reservoir area ecotourism conservation exploitation;
黄河小浪底库区生态旅游保护性开发研究
10.
Xiaolangdi Reservoir on the Yellow River:technologies and equipment for deepwater sediment treatment
黄河小浪底水库深水泥沙处理技术与装备构想
11.
Sediment discharging effect through density current of Xiaolangdi Reservoir and the response of the Lower Yellow River
黄河小浪底水库异重流排沙效果分析及下游河道的响应
12.
Study on Methods Used for Analyzing Adjoining Rock Stability of Underground Hydroplant in Xiaolangdi Project
对黄河小浪底水利枢纽地下厂房围岩稳定性分析方法的研究
13.
The Study of the Rule of Sediment Movement and Deposit and Operation of Reducing Sediment for Xiaolangdi Reservoir of Yellow River;
黄河小浪底水库库区泥沙冲淤规律及减淤运用方式研究
14.
Study on the Vegetation Community Diversities and the Partition of Degradation Phases of Degraded Hill of Xiaolangdi Reservoir Area;
黄河小浪底库区退化山地植被物种多样性和退化阶段划分
15.
On externality of tourism exploitation and its internalization of Xiaolangdi Scenic Spot on Yellow River;
黄河小浪底风景区旅游开发的外部性及其内化探析
16.
Practices and exploration of intensive management of Yellow River Xiaolangdi Tourism Development Co.,Ltd.
黄河小浪底旅游开发公司精细化管理实践与探索
17.
Treatment for oil and water penetration in anchorage chan-nel of sand discharge tunnel,Xiaolangdi key water control project
黄河小浪底水利枢纽排沙洞隧洞锚具槽渗油渗水处理
18.
China's trans-century super large water conservancy project-the Xiao Langdi Water Conservancy Project on Yellow River was completed in2001.
中国跨世纪的特大型水利工程黄河小浪底水利枢纽已于2001年度全部竣工。