说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 年度实施计划
1.
Practice of Annual Implementation Scheme for Near Term Construction:Taking Implementation Scheme of Wenzhou Urban Planning in 2007 as an Example
城市近期建设年度实施计划的实践探索——以2007年温州市城市规划实施建议为例
2.
1. Draw up and Implement the Plan to Capture Gold Medals at the 2008 Olympic Games
1.制定与实施2008年奥运会夺金计划
3.
The scheme was fully operative by 1975.
到1975年这一计划已完全实施。
4.
The March 1986 Program to stimulate the development of high technologies was implemented successfully.
“863”计划顺利实施。
5.
(13) the progress plan for the construction of the project; and
(十三)项目实施的进度计划;
6.
In the meantime, the implementation of the programme was ensured by formulating annual plan and conducting checking and reviewing of the construction land.
同时,通过土地利用年度计划和建设用地审核等手段,保障了规划的实施。
7.
OPERATIONAL ASPECT ABOUT IMPORT&EXPORT SITUATION OF JIANGXI COPPER COMPANY IN 2000 AND ARRANGED EXECUTIVE PLANS IN 2001;
江铜2000年进出口运行情况及2001年计划实施对策
8.
Tibet started to implement the Eighth Five-Year Plan and the Ten-Year Program in 1991.
从1991年开始,西藏进入了实施第八个五年计划和十年规划时期。
9.
Guangzhou Annual Land-for-urban-construction Plan: Research and Practice;
广州年度建设用地计划的探索与实践
10.
It was several years before the rocket scientists got the show in the road.
几年以后火箭科学家们才开始实施其火箭计划。
11.
A scheme for reporting smoky vehicles has been running since 1988.
检举黑烟车辆的计划自一九八八年开始实施。
12.
Analysis of measle incidence before and after EPI work in Gaoping district from 1954 to 1999
高坪区1954-1999年实施计划免疫前后麻疹疫情分析
13.
The Cost-benefit Analysis of EPI Implementation for 20 Years in Shanming City
三明市实施计划免疫20年成本-效益研究
14.
7 The new Five-Year-Plan is being carried out in all fields.
这个新的五年计划正在所有领域得到实施。
15.
Analyzing Implementation of the Olympic Education Plan of 2008 Beijing;
试析2008年北京奥运会奥林匹克教育计划的实施
16.
Enforcement of and Countermeasures for the Senior College Students Scientific Research Training Program;
高年级大学生科研训练计划的实施与对策
17.
Incorporate English learning as part of our school yearly effectuation.
(1)将英语学习纳入年度训练计画实施。
18.
Use the relevant background information to put together a project charter.
运用相关背景资料编制项目实施进度计划表.