1.
Study on Dichophase Project Financing Mode of Shenzhen Metro Line 4;
深圳地铁4号线二期工程项目融资模式研究
2.
Application of CFG pile on the No.3 line of Shenzhen subway
CFG桩在深圳地铁3号线中的应用
3.
Design of auxiliary system for Shenzhen Metro Line 1 extension
深圳地铁1号线续建工程车辆辅助系统设计
4.
Fireproof design of metro vehicle for Shenzhen Metro Line 1 express
深圳地铁一号线增购项目车辆的防火设计
5.
Design of Architectural Scheme of Taoyuan Station on No.1 Line of Shenzhen Metro
深圳地铁一号线续建桃园站建筑方案设计
6.
On the general design for metro line No.3 elevated segment bridge in Shenzhen
浅谈深圳地铁3号线高架段桥梁总体设计
7.
Reliability of Multifunctional Vehicle Bus for Shenzhen Metro Line 1
深圳地铁1号线续建工程多功能车辆总线网络系统的可靠性分析
8.
Decision of ATC-antenna fitting mode for Shenzhen Metro Line 1 extension
深圳地铁1号线续建工程车辆ATC天线安装方式的确定
9.
Study on Construction Method and Whole Structure Design in No .1 Line of Shenzhen Extend Metro;
深圳地铁1号线续建工程总体结构设计土建工法研究
10.
Detailed Exploration for Geotechnical Engineering of Qianhaiwan Station in Construction of Continued Project of Shenzhen Subway Line 1
深圳地铁1号线续建工程前海湾站岩土工程详细勘察
11.
Carbody Design for Shenzhen Metro Line 1 Expanding Engineering
深圳地铁1号线续建工程铝合金全焊接鼓形车体研制
12.
Options of Signaling System for the Extension Project of Beijing Subway Line 4
北京地铁4号线延伸信号系统方案分析
13.
Analysis of Interface between Vehicle and Signal of Guangzhou Metro Line 4
广州地铁4号线列车车辆与信号接口分析
14.
Analysis of Troubles in Safety Line of Door System for Guangzhou Metro No.4 Line
广州地铁4号线门系统安全线故障分析
15.
Analysis of Ground Distortion for Xisi Subway Station on the Line 4 of Beijing Subway
北京地铁4号线西四站地面变形与分析
16.
CFD Simulation on Tunnel Fire Smoke Control in Beijing Metro the 4th Line
北京地铁4号线隧道火灾烟气控制的CFD模拟
17.
Traffic Transfer Optimization of Higher Education Mega Center South in Guangzhou No.4 Metro Line
广州地铁4号线大学城南站交通换乘优化
18.
On Transfinite Treatment of Building Enclosure in the Construction of Foundation Ditch of Daxin Stop
深圳地铁罗宝线大新站基坑围护桩侵限处理探讨