1.
Analysis of Interaction between Parallel Tunnel Excavations and Its Application;
并行隧道施工相互影响分析及应用研究
2.
Study on the Influence Degree of Adjacent Construction of Three Parralell Shield Tunnels;
三孔并行盾构隧道近接施工的影响度研究
3.
Tunnels and depressed roads will be widely used to promote pedestrianisation.
区内将建有隧道及路堑式道路,并广泛设置行人专用区。
4.
Eastern Harbour Crossing road tunnel area
东区海底隧道行车隧道区
5.
The reasons of advanced wear for these machineries are analyzed and remedial ways are sought out.
就隧道施工机械的超前磨损原因进行了分析,并寻找了补救途径。
6.
Study on Three-Tube Parallel Shield Tunnel of Subway Approaching Constructed in Mollisol by Centrifugal Model Test;
软土地铁三管并行盾构隧道近接施工离心模型试验研究
7.
running tunnel [Mass Transit Railway]
行车隧道〔地下铁路〕
8.
The Western Harbour Tunnel Company Limited (WHTC) built and operates the Western Harbour Crossing (WHC) under a 30-year franchise.
香港西区隧道有限公司则兴建西区海底隧道,并获批30年的专营权经营该隧道。
9.
It was used by about 6 000 vehicles daily.
隧道免费行车,每日行车量约6000架次。
10.
Experiments and trial operation show that the system can automatically detect the trouble parking in tunnel and give an alarm.
系统试运行表明,该系统能自动检测隧道内的故障停车并发出报警信号。
11.
The Bund Sight-seeing Tunnel is China's first cross-river pedestrian tunnel dug by hi-tech means.
外滩观光隧道是我国第一条运用了高科技手段的越江行人隧道。
12.
Numerical Simulation of Influence of New Tunnel on Short Distance Parallel Old Tunnel during Shield Tunnelling;
近距离平行隧道盾构施工对老隧道影响的数值模拟
13.
Study on Mechanical Behavior during Large-span Tunneling and Closely-spaced Tunneling of Multiple Tunnels Region in Metro Station
大跨度车站进入区间隧道多洞地段隧道施工力学行为研究
14.
We inspect etch channel density of the seed piece by piece.
低腐蚀隧道:为确保低腐蚀隧道密度,我们对晶种的腐蚀隧道密度进行逐块检测。
15.
remove graffiti from the subway walls
除去人行隧道墙上乱涂乱画的痕迹
16.
combined entrance [Mass Transit Railway and pedestrian subway]
共享入口〔地下铁路及行人隧道〕
17.
A project is on foot to build a new tunnel here.
在此地修一条新隧道的计划在执行中。
18.
STUDY ON MECHANICAL BEHAVIOUR OF TUNNEL ANCHORAGE SYSTEM FOR SUSPENSION BRIDGE
悬索桥隧道式锚碇系统力学行为研究