1.
Study of Reliability Evaluation for Bus Configurations of Power Station and Substation;
发电厂、变电站电气主接线可靠性评估的研究
2.
Research for Reliability Analysis of Bus Arrangement on 750kV Station;
750kV变电站电气主接线的可靠性分析研究
3.
Study of Synthetical Assessment System in Distribution Substation Main Electric Connection;
变电站电气主接线综合评价系统的研究
4.
Reliability and Economic Evaluation of the Bus Configuration of the Substation;
变电站电气主接线可靠性与经济性评估
5.
RESEARCH AND PRACTICE ON RELIABILITY EVALUATION OF POWER STATION BUS SYSTEMS ARRANGEMENT;
发电厂电气主接线可靠性研究与实践
6.
Operational analysis of the main connection of 220kV section in the 500kV substation
500kV变电站220kV侧主接线运行分析
7.
The String Configuration Rule and Strategy in 500kV Station of Henan Power Grid
河南电网500kV变电站主接线配串策略研究
8.
Study on Tranmission Network Reliability Considering the Impact of Substation Bus Arrngement;
计及变电站主接线影响的输电网供电可靠性研究
9.
The Choose of the Main Electrical Connection in ±800kV YUN-GUANG UHVDC Transmission Project
±800kV云广特高压直流输电工程换流站主接线选择
10.
An Approach on Main Scheme of Converter Station for ±800kV HVDC Project
±800kV特高压直流输电工程换流站主接线探讨
11.
Discussion about Switching Operation of Conection Mode of 3/2 of 500 kV Kilovolt Substation
500kV变电站3/2断路器主接线倒闸操作的探讨
12.
The main components and the single ling diagrams of DC power transmission converter station
直流输电换流站系统构成及主接线方式
13.
Wiring modes of main substations for urban mass transit and their harmonic influences
城市轨道交通供电主变电站接线模式分析及其谐波影响的研究
14.
The reliability criterion of bus arrangement systems is power supply continuity.
变电所电气主接线可靠性判据应该是:供电连续性。
15.
Discussion on the Connection of Shunt Reactor in the Substation Supplied with Long Power Cables
长电缆供电变电站并联电抗器接线方式探讨
16.
Study and improved arithmetic about electrical connectedness of main electrical scheme
基于图形化主接线图的电气连通性分析和研究
17.
Operation mode adjustment of atypical 220 kV substation station power using system connection mode
220kV变电站非典型站用电接线的运方调整
18.
Converting Geographic Information System (GIS) Based Feeder Maps into One-line Diagrams;
配电馈线地理图到电气接线图的转换