1.
Analytical method for stochastic net present value with investment risk;
带投资风险度的随机净现值分析方法
2.
The opportunity cost of capital is 10%. We can calculate the NPV as follows...
资本的机会成本是10%。净现值计算如下…
3.
Analysis and Improved Method of the Net Present Value and Annual Equal Value;
净现值与净年值指标分析及改进方法
4.
The Stochastic Order and Dual Stochastic Order of Real-Valued Random Variables;
实值随机变量的随机序与对偶随机序
5.
The NPV can also be calculated by referring to a published table of present values.
净现值也可以通过查现值系数表计算。
6.
Using the table of present values, the calculation of NPV is as following...
运用现值系数表,净现值的计算如下…
7.
The Limiting Distribution of Present Value Function and Its Upper and Lower Bounds Under Stochastic Rate of Interest;
随机利率下现值函数的极限分布及其上、下界
8.
SOME MOMENT S RESULTS OF PRESENT VALUE FUNCTION OF INCREASING LIFE INSURANCE UNDER RANDOM INTEREST RATE;
随机利率下增额寿险现值函数矩的一些结果
9.
Actuarial Present Value Model of Life Insurance Portfolio under Stochastic Interest Rate
随机利率下寿险组合精算现值模型研究
10.
Numerical Study of Stochastic Supersensitivity for 2D Generalized Burgers' Equation
二维广义Burgers方程随机超敏感现象数值研究
11.
If the NPV is negative the project should be rejected because it is not a wealth creating opportunity.
如果净现值是负数,该项目应放弃,因为它不是创造财富的机会。
12.
We then try a higher figure. Applying 3% gives a negative NPV of $10.
然后用较高的折现率3%,净现值为负10。
13.
The Random Fixed Points of the Random Set-valued A-proper Mappings
随机集值A-proper映象的随机不动点
14.
ratio of discounted net benefit to cost
净收益贴现值对成本比率;净收益贴现值对成本比率
15.
This present value is then“ netted” against venture-related investments to yield the NPV.
这个现值减去企业相关投资就得到了净现值。
16.
The receivables, therefore, are not stated at estimated net realizable value.
因此应收款不反映预计的可实现净值。
17.
In other words, it is the discount rate that will cause the net present value of an investment to be zero.
即使项目的净现值为零的利率。
18.
The difference between NPV method and IRR method can be described as following...
净现值法和内含报酬率法的区别如下…