说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 江垭水库
1.
Optimization of the Jiangya Inhabitant Resettlement based on the Fuzzy Theory;
基于模糊理论的江垭水库移民安置区模式优选
2.
Hunan jiangya Dam undertaken by Bureau of Water Conservancy and Hydroelectric Power Construction of Liaoning Province is one of the national priority projects of China during the Nineth Five-year Plan.
由辽宁省水利水电工程局承建的湖南江垭水库,是我国九.五期间重点工程。
3.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
4.
STUDIES ON ENVIRONMENTAL CAPACITY OF THE SETTLEMENT AREA IN THE REGION OF SHUIBUYA RESERVOIR ON THE QINGJIANG RIVER;
清江水布垭水库农村移民安置区环境容量研究
5.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
6.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
7.
Practice of disperse-resettlement for Shuibuya Hydropower Station;
水布垭水电站库区移民分散安置的实践
8.
Practice of Involvement of Owner in Reservoir Resettlement of Shuibuya Hydroelectric Project;
水布垭工程业主参与库区移民工作的实践
9.
Earthwork Design for Cubic Meter of Earth and Stone in Qingjiang Rockfill Dam Construction;
清江水布垭面板堆石坝动态土石方平衡设计
10.
Closed-type Management & Vehicle Auto-distinguishing System at Construction Site of Shuibuya Hydro-project;
清江水布垭工区封闭管理和车辆自动识别系统
11.
Analyzing stator windings main protection of generator for Qingjiang Shuibuya hydropower station
清江水布垭电站发电机定子绕组主保护分析
12.
Regulation quality parameter test technology of 460MW unit in Shuibuya Hydropower Station
清江水布垭电站460MW机组调节品质参数测试技术
13.
The PLC Controlling of the 500 kV Main Transformer Wind Cooling System in Shuibuya Hydropower Station in Qingjiang
清江水布垭电站500kV主变风冷系统PLC控制
14.
Electric braking in application to generating sets of Qingjiang Shuibuya Hydropower Plant
电气制动在清江水布垭电厂发电机组的应用
15.
Difficult operating status of flood control type waterpower plants and its countermeasures;
防洪型水力发电企业的经营困境及对策——以江垭水电站为例
16.
Analysis of Problems and Defects of Electric Equipment of NO.2 Unit in Shuibuya Hydropower Station
清江公司水布垭水电站2号机组设备缺陷问题及分析
17.
Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City.
水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
18.
Variable economical factors in construction of Jiangya dam;
江垭大坝工程施工中变化的经济要素