说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 煤柱设计
1.
Test Study of Coal' Strength & Deformation Characterstic and Application in Strip Pillar Design;
煤岩强度与变形特征实验研究及其在条带煤柱设计中的应用
2.
Design of rational width of coal pillars in gateways in gently inclined shallow coal seams
浅埋缓斜煤层回采巷道合理煤柱宽度设计
3.
Optimization of the Design of Mining Area and to Mine Reasonably the Coal-Pillar of Mine Surface Plant;
优化采区设计 合理开采工业广场煤柱
4.
Study on Optimization Design and Destruct Monitoring Character of Coal Pillar in Longwall Remaining Coal Pillar Support Mining;
长壁留煤柱支撑法开采煤柱优化设计及破坏的可监测性研究
5.
The Program Development and Application of Design Architectural Complex Protective Coal Pillar
设计建筑群保护煤柱的程序开发与应用
6.
Method of designing protection coal pillar in mine area based on prediction of surface deformation
基于地表变形预计的矿区保护煤柱留设方法
7.
Theoretical determination of the section coal pillar's reserve-width in medium thick coal seam
中厚煤层区段煤柱留设宽度理论确定
8.
Optimized Stress Distribution and Size of Coal Pillar in Fully Mechanized Coal Mining
综放开采区段煤柱应力分布及其尺寸优化设计研究
9.
A 3D Numerical Analysis of F_2 Fault Waterproof Pillar in Tao Yuan Coal Mine;
桃园煤矿F_2断层防水煤柱留设的三维数值分析
10.
The discussion about waterproof mine columniationpillar width in Small coal mines bare area
小煤窑采空区留设防水煤柱合理宽度的探讨
11.
Analysis of Coal Mine Water-filled Conditions Under Thick Cenozoic and Coal Pillar Preserve
巨厚第四系下煤矿充水条件与煤柱留设的分析
12.
Study on Reasonable Width of Coal and Rock Pillar under Thick Aquiferous Loose Bed;
厚含水松散层下煤岩柱合理留设研究
13.
Protective coal pillar set method and development tendency in China
我国保护煤柱留设的方法及发展趋势
14.
Calculation and evaluation on the safe width of fault waterpro of coal (rock) pillar
断层防水煤(岩)柱安全宽度的计算与评价
15.
Numerical Simulation and Calculation on Plastic Zone Width of Coal Pillar for Strip Mining
条带开采煤柱塑性区宽度的数值模拟与计算
16.
Fluid-Solid Coupling Analysis of the Fault Waterproof Coal Pillar;
断层防水煤柱合理留设的流固耦合分析
17.
Investigating Reasonable Scale of Pillars for Protecting Workings Lying under Thrust Sheets;
推覆体下伏工作面防水煤柱合理留设的研究
18.
The Research of Reasonable Setting up Pillar Coal to Prevent Sand from Collapsing in the Moderate and Thick Unconsolidated Formation;
中厚松散层下防砂(塌)煤柱合理留设研究