1.
Deformation Analysis of an Existing Subway Station Structure Traversed Down by a Large Shield Tunnel
大直径盾构隧道下穿既有车站诱发车站结构变形分析
2.
The application of CFG pile in foundation treatment of signal building in existing station
CFG桩在既有车站信号楼地基处理中的应用
3.
Study on Undercrossing Existing Metro Station Construction Scheme of Beijing Metro Line 4 Xuanwumen Station
北京地铁四号线宣武门站下穿既有车站施工方案研究
4.
Analytical Study on Joint Construction Impact of Three Metro Lines Transfer Station upon Structure of Existing Metro Stations
地铁三线换乘站帮接建设对既有车站结构的影响分析研究
5.
Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing;
地铁新线车站穿越既有线车站的施工力学分析
6.
Design and construction measures for a light-rail station to be built above an existing tunnel
既有隧道上方修建轻轨车站的设计与施工对策
7.
Study on Construction Technique of Metro Station Driven with Enlarging the Existing Shallow Air Defense Tunnels
浅埋既有人防隧道扩挖地铁车站施工技术研究
8.
On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station
浅埋暗挖地铁车站地表沉降及既有线变形分析
9.
Numerical Simulation of Shield Tunnel Passing under the Existing Subway Station
盾构隧道近接下穿既有地铁车站的数值模拟
10.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
11.
Research on the Effection and Deformation Control of Double-line Tunnel Undercrossing Existing Subway Station
双线暗涵近距离下穿既有地铁车站的影响及变形控制研究
12.
Regulations Study on Influence of Existing Pile Foundation Near Subway Station by Metro Airway Tunneling
地铁车站风道施工对既有桥梁变形的影响规律研究
13.
Safety Research on Lining Structures of Subway Station and the Existing Tunnel Underlying
地铁车站与下伏既有隧道的衬砌结构安全性研究
14.
Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
地铁车站下穿既有线隧道施工中的远程监测系统
15.
By opening the present station both to the rails and to the sky, light and space penetrates into it.
通过开口将车站既与铁轨又与天空相连,光与空间能够透射到车站。
16.
Research on the Simulation Model of High-Speed Trains' Private Yard under the Condition of Introducing the Passenger-Dedicated Line into Existing Station
客运专线引入既有客运站条件下高速车场作业系统仿真模型的研究
17.
Experimental Study on Application of Rigid Rail-Cement-Soil Mixing Piles in Foundation Pit of Rehabilitation Project of Existing Station of Tianjin Metro
钢轨劲性水泥土搅拌桩墙在天津地铁既有线车站改扩建工程基坑中的试验研究
18.
You've four stops before you get to the station.
你到火车站以前还有四个公共汽车站。