1.
Study on the Energy Dissipation Design and Operation of Multi-strobe in Low Water Head Dams;
多闸孔低坝消能设计与闸门调度研究
2.
Using Optimize Multinomial Analysis Runoff Modulus in Naodehai Reservoir;
闸孔出流系数率定方法研究及个例分析
3.
Construction of longitudinal cofferdam puncture sluice hole of expanding units civil engineering in Yanzhou hydropower station
艳洲水电站扩机土建工程纵向围堰穿闸孔施工
4.
Reserch & Structural Reinforce Design of Flood Control Sluice in Linhuaigang Flood Control Project;
临淮岗49孔浅孔闸结构加固设计与研究
5.
Developtment of A Microcomputer Controlling Device Applied to Water Gate on Tidal Channe1
多孔潮水闸自动控制仪的研制和应用
6.
a hand operated lever that controls the throttle valve.
控制节流闸流量的手孔杠杆。
7.
Program for Small and Middle Submersible Bulkbead Cate Design
中小型潜孔式平面钢闸门设计程序系统
8.
The Design of the Spillway Crest Outlet Pre-stressed Gate Pier Structure of Jufudu Hydropower Project
居甫渡水电站溢流表孔预应力闸墩结构设计
9.
3D finite element analysis of prestressed pier of amptying bottom outlets in Xiaowan arch dam
小湾拱坝放空底孔预应力闸墩三维有限元分析
10.
Structure recheck and reinforcement of pier of spillway tunnel of Lishimen reservoir
里石门水库泄洪孔闸墩结构复核及加固
11.
Liuqiao Sluice on Tuhaihe River is a sluice with 10 gates built on the downstream of Tuhaihe River in Liaocheng City, which operates for many years.
徒骇河刘桥拦河闸是聊城市境内徒骇河下游一座10孔拦河节制闸,已运行多年。
12.
Desilting Sluice Underport Working Chamber Analysising of a Project by 3-Dfinite Element Method;
某工程泄洪排沙底孔工作闸室三维有限元计算分析
13.
Test of Cavitation Characteristics on Service Gate Slotss for Middle Outlet Works in Jishixia Hydropawer Sation;
积石峡水电站中孔泄洪洞平面工作闸门槽空化特性试验研究
14.
Study about Construction Management Technology and Method of Linhuaigang Deep Hole Sluice in Anhui Province
安徽省临淮岗深孔闸工程施工管理技术方法研究
15.
Application of seepage wall formed by multi-head and small-diameter mixing piles in deeper sluice project
多头深层搅拌桩截渗墙在涡阳枢纽深孔闸工程中的应用
16.
Study on cavitation characteristic of working gate slots in middle spillway tunnel of Jishixia hydropower station
积石峡水电站中孔泄洪洞平板工作闸门槽空化特性研究
17.
Therefore, when the lifting force of gate of the bottom outlets is designed, the sediment pressure and friction force should be considered by full holes sediment.
所以在设计底孔闸门启门力时,泥沙压力及摩擦力可按满孔泥沙考虑.
18.
Abstract: The outflow through gate controlled multi-opening spillway of Yinhe Reservoir was analyzed. The analysis results were checked by the site observed data.
文摘:分析了音河水库多孔有闸门控制的溢洪道出流,并用出流的实测资料进行了检验。