1.
open caisson method in underground construction
地下工程沉井法施工
2.
Heavy equipments of the construction technology of the open caisson method in the abnormal box foundation
重型设备异形箱体基础沉井法施工技术
3.
Construction Technology for Mine Shaft Sinking Bysimple f Metal Ring Open Caisson Method and Synthetic Grouting Wall Construction Method
简易金属井圈沉井法和壁后注浆综合施工法过井筒流沙层施工技术
4.
pplication of Caisson method Construction Technology to the Special-shaped box basis of Heavy Equipment
沉井法施工技术在重型设备异形箱体基础中的应用
5.
Elementary Discussion on Deep Well Dewatering in Construction of Open Caisson by "Drainage Sinking Method"
浅谈“排水下沉法”沉井施工中的深井降水
6.
On Un-drained Dredging and Underwater Sealing Construction Technology Using T Shape Sink Well
T形沉井不排水法下沉及水下封底施工技术
7.
Application of Hydraulic Suction Method in Larger Open Caisson Construction
水力冲吸法在较大沉井施工中的应用
8.
Monitoring Technique for Sinking Resistance of Large Caisson Group
大型沉井群的沉井下沉阻力监测技术
9.
Adopt "water-jet" method to embedded well point pipe. Connect to the water-collect main line while the well point pipe is in the position.
采用"射水法"埋设井点管.井点管下沉到位后,与集水总管连接.
10.
Forecast of Mining Subsidence's Influence on Land Use by Using GIS;
矿井开采沉陷影响土地利用系统的GIS分析方法
11.
Research on Construction Method of Bridge Caisson Foundation under Special Geologic Condition;
特殊地质条件下桥梁沉井基础施工方法的研究
12.
The Approaches for the Construction of Super Large Open Caisson Foundation of the North Anchorage on the Yangtze River Highway Bridge at Jiangyin
江阴长江公路大桥北锚碇基础特大沉井施工方法
13.
Research into the Settlement Observation of Buildings Nearby under Pile Driving and Foundation Well-points Dewatering;
基础打桩和基坑井点降水情况下周边建筑物沉降观测方法的研究
14.
submerged wellhead platform system
沉没式井口平台系统
15.
bottom supporting drilling platform
定柱沉垫式钻井平台
16.
shaft-sinking [caisson works]
打/挖竖井〔沉箱工程〕
17.
circulating out fill
循环带出井底沉淀物
18.
mat support jack-up rig
沉垫自升式钻井平台