说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 箱梁节段
1.
Construction technology of box-girder segment bricolage of traversing carriage bridge fabrication machine
移动支架造桥机箱梁节段拼装施工技术
2.
Analyse and Control of Cracks of Prestressed Concrete Box Girder Web
悬浇箱梁节段张拉后腹板裂纹成因分析与防治
3.
Test Study of Sectional Model of Separated Steel Box Girders of Xihoumen Bridge
西堠门大桥分体式钢箱梁节段模型试验研究
4.
On Box Girder Precast Segment Assembling by Short-line Method & Alignment Control Technological Principle
短线法箱梁节段预制拼装及线形控制技术原理
5.
Application of ANSYS on box beam segment three-dimensional prestressing analysis
ANSYS在箱梁节段三向预应力分析中的应用
6.
This paper presents the manufacture, welding in site, quality control of the steel box beam.
叙述了该桥钢箱梁节段的制作、地焊接和装配焊接质量控制。
7.
Test and Analysis for Segmental Box Girder Model of Super Wide Span Continuous Rigid Frame Bridge;
超大跨连续刚构桥预应力箱梁节段模型试验及数值分析
8.
Prestressed Concrete Box Girder Segmental Anchoring Tensioned Floor Surface Analysis and Processing of Longitudinal Cracks
预应力砼箱梁节段张拉锚固面底板纵向裂缝分析与处理
9.
Researching Manufacture of Newly Prefabricated Box Beam Segment Bridge Erector and Technology of Assembly Quality Control
新型预制箱梁节段架桥机的研制及拼装质量控制技术
10.
The Construction Craft at 0 #~1 # Node Section of Box Continuous Beam
箱形连续梁0~1~#节段施工工艺
11.
Geometric Shape Control of Precasting of PC Box Girder Segments by Short-Line Match Method
预应力混凝土箱梁短线法节段预制线形控制
12.
Key issues of prefabrication of the pre-stressed concrete box segments using the short line casting method
预应力混凝土箱梁短线台节段预制关键技术
13.
Analysis of Spatial State for Temporary False Work of Steel Box Girder During Large Segmental Installation
钢箱梁大节段安装临时支架空间状态分析
14.
Study on the Mechanical Characteristics of Precast Segmental Concrete Box Girders with External Tendons;
预制节段拼装体外预应力混凝土箱梁受力特性研究
15.
Research and Application of Cantilever Assembly Equipment to Prefabricated Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装设备研究与应用
16.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
17.
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工
18.
The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder
钢箱梁斜拉桥主梁顶推法施工阶段控制研究