说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高水头大流量
1.
Numerical Study on Configuration Optimization of High Head Large Flood Discharge Tunnel
高水头大流量泄洪隧洞体型优化数值模拟研究
2.
Research Flood Releasing Safety of Flood Discharge Structure with High-head & Large-discharge
高水头大流量泄洪建筑物的泄洪安全研究
3.
Discussion on energy dissipation design for hydropower station at high head and large discharge
大流量高水头水电站泄洪消能设计的探讨
4.
Experimental Study on the Design of Spillway with High Water Head and Large Unit Discharge;
高水头大单宽流量溢洪道的试验研究与设计
5.
Turn the cock to increase the flow of water.
请开大龙头以增加水流量。
6.
Suggestion: according to the water cubage of aquarium( pool) and Max. flux if pump, and the size of tube diameter, cut the pagoda type hose joint to match if.
建议:宝塔式水管接头,可根据水族箱()水容积及水泵最高流量,结合管径大小加以切除配套。
7.
Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;
低水头大流量厂坝联合泄洪消能流场的研究
8.
Experimental Research of Discharge Coefficient of the Plat Gate in Small Opening at High Water Head
高水头闸室平板闸门小开度流量系数试验研究
9.
It possesses the characters of high head, high velocity, long operation time and large variation range of water level.
它具有水头高、流速大、运行时间长、水位变幅大等特点。
10.
At the bore, water level rises rapidly, accordingly, vertical component of velocity must be considered.
涌潮潮头处,水位骤涨,相应地,流速的铅垂分量必有一定大小。
11.
This is a diversion power station of high flood peak.
该工程为高水头迳流引水式电站。
12.
Research on Stability of the Large-scale Reservoir Harbor Slope in Mountain Region River and the Influence on the High Pile Wharf Structure
山区河流大型水库港边坡稳定性及对高桩码头结构影响分析研究
13.
When the downstream head is greater than about 3/5 of the upstream head, flow is submerged.
当下游压头大于上游压头约3/5时,流量是潜流。
14.
Potential effects of atmospheric carbon dioxide enrichment on the loss of microelements of paddy field water
大气CO_2含量升高对稻田水体微量元素流失的潜在影响
15.
Two-Dimensional Turbulent-Flow Numerical Modeling in No-pressure Tunnel of High Water Reservoir;
高水头下水库无压泄水洞的二维紊流数值模拟
16.
Water Turbine Design for Hydropower Station with High Water Head in Sedimentladen River
浅析高水头多沙河流水电站水轮机的设计
17.
upper atmosphere observation by trails of the meteors
高层大气流星余迹测量
18.
3-D Numerical Simulation on Flood Discharge Tunnel with High Water Head and Free Water Surface;
高水头明流泄洪洞三维数值模拟研究