1.
Experiments and Research about the Current s Energy Dissipator in Low Fr. (Diffluent Piers with Low Ridge);
低Fr.水流消能工的实验研究(低坎分流墩)
2.
Water Flow Regime and Flow Velocity Behaviors in Stepped Spillways with Aerated Piers
掺气分流墩台阶式溢洪道的水流流态和流速特性
3.
Research about Applying Diffluent Piers with Low Ridge to Jingjitan Hydro-Junction;
低坎分流墩在金鸡滩水利枢纽工程中的应用研究
4.
The Probe into the Weakening Wave Mechanism and Hydraulci Design of Diffluent Piers with Low Ridge;
低坎分流墩的削波机理及其水力设计方法的探讨
5.
Water flow regime and flow velocity behaviors in stepped spillways with aerated piers are studied via the model tests.
通过模型试验 ,研究了掺气分流墩台阶式溢洪道的水流流态和流速特性。
6.
The aerated flow splitting pier firstly applied in Zhalin Hydropower Station, is a new type facility for dissipation of energy, mitigating cavita-tion damage and erosion.
掺气分流墩是首次应用于柘林水电站的一种新型掺气消能减蚀(防冲)设施。
7.
The wedge-shaped end of a bridge pier, designed to divide the current and break up ice floes.
桥墩分水角桥墩的楔形边缘,用来分开水流并打碎浮冰块
8.
Seismic Response Analysis of Piers in Deep Water Considering Fluid-Structure Interaction
考虑流固耦合作用的深水桥墩地震响应分析
9.
Displacement and Seepage Monitoring Analysis for Huanren Massive-head Single-buttress Dam
桓仁单支墩大头坝位移及渗流监测分析
10.
Analysis and Treatment of Cracking Along Water Current Direction on the Double-hole Water-conveyance Tunnel in Ship Lock of Three-Gorge Project;
三峡船闸中隔墩输水隧洞顺流向裂缝分析与处理
11.
Study on Formation Causes of Pier Cracks and Rehabilitation Procedures for FENGMAN Dam;
丰满水电站溢流坝闸墩裂缝成因分析及其加固技术研究
12.
Cause Analysis and Reinforced Structure Safety of Cracks of Concrete Piers of Overflow Dam
混凝土溢流坝闸墩裂缝成因分析及加固后安全评价
13.
Flow Velocity Distribution Around Semicircle Cylinder Pier In Rectangular Channel
矩形断面明渠中半圆形边墩周围流速分布特性研究
14.
Numerical analysis of local scour around complex piers for a sea-crossing bridge
某跨海大桥复合桥墩潮流作用下局部冲刷深度的数值分析
15.
Box Girder and Thin Walled Pier Spatial Analyse of the Long Span Cured Bridge with High Pier;
高墩大跨径弯桥箱梁薄壁墩空间分析
16.
Analysis of Stability of Long-span Continuous Rigid Frame Bridge
高墩大跨径连续刚构桥墩身稳定分析
17.
Design of Diversion Piers and Division Pier in Chaodongweigang Water Conservancy Project
朝东圩港闸站枢纽导流墩及中隔墩设计
18.
Numerical Simulation on United System of Flaring Gate Peers, Stepped Spillway and Stilling Pool;
宽尾墩和阶梯溢流坝一体化数值模拟