说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 后张拉
1.
Research on Shape Forming Process and Load Behaviors of Post-tensioned and Shaped Barrel-vault
后张拉整体成形筒拱的成形和承载力性能研究
2.
The 35 m span post stretching prestressed concrete box beam prefabricated construction
35m跨后张拉预应力混凝土箱梁预制施工
3.
Experimental Study on Shape Formation and Vertical Ultimate Load Capacity of Post-tensioned and Shaped Hypar Space Truss;
后张拉预应力成形鞍形网壳的成形和竖向极限承载力试验研究
4.
Research on Shape Forming Process and Load Behaviours of a New Post-Tensioned and Shaped Dome;
一种新型后张拉整体成形穹顶的成形和承载力性能研究
5.
Formed Process and Load Behaviors Research on Partion Double-Layer Barell-Vault Rebiculated Shell Shaped by Posttensioning
后张拉整体成型局部双层柱面网壳成型和承载力研究
6.
FORMED PROCESS RESEARCH ON LOCAL DOUBLE-LAYER BARREL-VAULT RETICULATED SHELL BY POSTTENSIONING
后张拉整体成型局部双层柱面网壳成型过程的研究
7.
Calculation of Extension Value about Post-tensioning Prestress Steel Wire Strand
后张法预应力板钢丝束张拉伸长值的计算
8.
Tension Effect Test of Bonded Post-tensioned Prestressed Concrete Beam
后张有粘结预应力混凝土梁张拉效果检测
9.
Batch Prestress Loss of Concrete Pipe Pile by Post-Tensioning Method
后张预应力混凝土管桩分批张拉预应力损失
10.
Iterative Method of Structural Analysis about Removal of Cable in Cable-stayed Structures with Pretension
预张力斜拉结构拉索卸除后结构分析的迭代法
11.
The cable is then tensioned and anchored at the ends.
然后将钢索张拉并锚固于端头处。
12.
After closure, final tensioning of stay 4 is accomplished.
合拢以后,拉索4的最终张力即告完成。
13.
3×40 Meter Consecution Beam Empress Piece the Method Double Prepare to Curve in Response to the Dint Reinforcing Bar the Piece Pull to Control the Technique Measure
3×40米连续梁后张法双向曲线筋张拉控制技术措施
14.
Research of Enhancing an Approval Qualified Rate of the Tensioning Procedure for Post-tensioned Pre-forced Concrete;
提高后张法预应力混凝土张拉工序一次验收合格率的研究
15.
Finite element analysis of post tensioning prestressed concrete box girder
后张法预应力混凝土箱梁张拉次序的有限元分析
16.
Analysis of Abnormal Condition of Stretching Extension Value of Prestressed Strand Wire by Post-tensioning Method
后张法预应力钢绞线张拉伸长值异常情况的分析
17.
Analyse and Control of Cracks of Prestressed Concrete Box Girder Web
悬浇箱梁节段张拉后腹板裂纹成因分析与防治
18.
The nerves of the landowner, who said that business went slowly in this country and that was why they were backward snapped when the trial stretched on.
地主的精神很紧张,他说这个地方办事拖拉,这就是他们落后的原因。