1.
Improvement measure of frame-shaped underpass bridge construction and quality control of jacking process
框构地道桥施工改进措施和顶进过程质量控制
2.
Construction and fit-out work entered its most intensive phase during the year.
年内,建造工程及装修工程进入顶峰期。
3.
During the ceremony, Galileo watched the wind swing a heavy light that hung from the ceiling.
在仪式进行的过程中,伽利略观察着风把屋顶上的吊灯吹得来回摆动的情景。
4.
Rain has worked in through the roof.
雨水透过房顶逐渐渗进屋子里.
5.
Wind and rain leaked in through several tears in the canvas roof.
风雨通过帆布顶的一些裂隙灌进来。
6.
Mining Ceiling Management of Dounan Branch Mine in Mining
斗南分矿区采掘过程的顶板管理措施
7.
No control over the vertices once it enters into the pipeline.
程序员无法控制进入管道内的顶点。
8.
During the course of oxidation, peroxide values reach a peak and then decline.
在氧化过程中过氧化值达到一个顶峰然后下降。
9.
Implementing Famous Brand Strategy to Promote Tea Industrilization;
实施龙顶名牌战略 推进茶叶产业化进程
10.
The algorithm iteratively perturbs every control point to reshape the control net by inputting data points one by one.
逐个输入数据点后,通过对控制顶点进行扰动来求取新的控制顶点。
11.
Improvement of Jacking Machine for Ultra Big-Diameter Steel Pipe and Surveying Control Technique
特大直径钢顶管工程中的顶管机改进及测量控制技术
12.
Rainwater can undertake through roof garden save up and biology are handled.
雨水可以通过屋顶花园进行蓄积和生物处理。
13.
Find that and you've found your USP.
(这个过程洞察你的3个最顶尖竞争对手。
14.
Process Modeling and Planning of Top-down Collaborative Assembly Design;
自顶向下的协同装配设计过程建模及规划研究
15.
The Application of Process Method on Working Practice in Teaching Procedure;
过程方法在顶岗实习教学环节中的应用
16.
Passegner Cars Roof Ditch Molding Free Proposal Implementation Process Study
轿车车顶无饰条工艺方案实施过程研究
17.
Practice and Research of Process Management of Substitution Internship of Secondary Vocational School Students
中职生顶岗实习过程管理的实践与研究
18.
Preliminary Exploration on Metal Element Behaviors in Lead Smelting Process of Oxygen-rich Top Blowing
富氧顶吹炼铅过程中金属元素行为初探