1.
But this situation will soon be changed along with unceasing expansion of construction scale of hydropower engineering for irrigation works.
但随着水利水电工程建设规模的不断扩大,相信不久会有所改观。
2.
Exploration for current pricing module in Code for Pricing in Engineering Quantity of Architectural Engineering
现阶段建设工程工程量计价规范计价模式探讨
3.
The Three Gorges Project is a large-scale project with long construction period and large investment demand.
三峡工程规模巨大,建设工期长,投资需求大。
4.
Work was begun on 36 new key projects, which called for a total investment of over 600 billion Yuan.
新开工建设36项重点工程,投资总规模6000多亿元。
5.
Specification of thermotic design of civil building
民用建筑热工设计规程
6.
building permit
建设工程规划许可证
7.
The sand-control project has entered a new stage on a gigantic scale.
防沙治沙进入了工程化、规模化建设新阶段。
8.
Analysis on the Influence of Current Construction Regulation on the Development of Construction Project Transaction Mode;
现行建设法规对工程交易模式发展影响的分析
9.
Project Planning Management of GZ MTR Massive Construction Period
广州地铁大规模建设期间的工程计划管理
10.
Specification for design and construction of hydraulic and removable formwork project
液压滑升模板工程设计与施工规程
11.
Code for hoisting work in chemical construction
化工工程建设起重施工规范
12.
Regulation for technical document of delivery in chemical construction and acceptance of titanic piping
化学工业工程建设交工技术文件规定
13.
The Standardization Research for Inviting a Tender and Submitting a Tender of the Planning and Designing in Architecture and Engineering;
建筑工程规划设计招投标规范化研究
14.
Specification for engineering acceptance of hydropower station capital construction
水电站基本建设工程验收规程
15.
Technical code for geotechnical investigation of metallurgical industry reconstruction
冶金工业建设岩土工程勘察技术规范
16.
Code for safety of power sup-ply and consumption in engineering construction site
建设工程施工现场供用电安全规范
17.
Code for visual inspection and acceptance of site weld of engineering construction
工程建设施工现场焊接目视检验规范
18.
Standard for technical documents of project construction completion
工程建设交工技术文件规定