1.
Compatibility Torsion Test of Spandrel Beam with Cast-in-Place Slab in Long-Span PC Secondary Beam Floor System
带板大跨度预应力次梁楼盖边主梁协调扭转试验
2.
Study of 3D Effect of Cable-stayed Bridge with Double-triangle Side Box Girder
斜拉桥双边箱主梁空间受力特性研究
3.
Discussion on Aerodynamic Admittance of Flat Double-Girder Bridge Decks through Cross-Correlation Spectrum Recognition
扁平双边肋主梁桥梁断面气动导纳互功率谱识别方法探讨
4.
Closure Techniques for South Side Span Steel Girder of Main Bridge of Dashengguan Changjiang River Bridge in Nanjing
南京大胜关长江大桥主桥钢梁南边跨合龙技术
5.
A Brief Analysis of Liang Qichao S Utilitarianism EthicsView Developing the Good and Discarding the Bad Based on Bentham s Utility Idea;
浅析梁启超功利主义伦理观对边沁功利观的扬弃
6.
He laughed and jabbed his spectacles back on his nose(John Barth)
他边笑边推鼻梁上的眼镜(约翰 巴思)
7.
Test and Analysis of Compatibility Torsion of Spandrel Beams in the Floor System without Cast-in-Place Slab
无板楼盖边梁—楼面梁协调扭转试验研究
8.
Shear Behavior of Exterior RCS Beam-Column Connections
钢梁-钢筋混凝土柱梁柱边节点抗剪性能分析
9.
Simulation of compatibility torsion experiments of a spandrel beam in a long-span prestressed concrete secondary beams floor system
大跨度预应力次梁楼盖边梁协调扭转模拟分析
10.
Test and Analysis of Compatibility Torsion in the Long-span P.C. Secondary Beams Floor System;
大跨度预应力次梁楼盖边梁——楼面梁协调扭转试验及研究
11.
The beam is divided in4 parts, two each sitting on each main girder.
箱梁分为4个部分,每根主梁上2个。
12.
The main girders support I-section transverse ribs.
主梁支承着工字梁的横向肋。
13.
Investigation of Long-Span Bridge Girder Spanwise Vortex-Induced Vibration
大跨度桥梁沿跨向主梁涡激振动研究
14.
Study on Static Behavior of Joint of Steel Sub-Beam and Concrete Beam
钢次梁—混凝土主梁节点静力性能研究
15.
STUDY ON FORCED PERFORMANCE TEST OF EDGE JOINTS FOR REINFORCED CONCRETE FLAT BEAMS WITH EDGE BEAM
钢筋混凝土有边梁扁梁边节点受力性能试验研究
16.
gantry crane with movable girder
可移动主梁门式起重机
17.
Design of beams without slab restricted on both sides and columns beyond several floors for the floor side partial opening of tall building
高层建筑楼板侧边开洞后单边梁、跨层柱的设计
18.
Steel-rimmed glasses rode down on her nose.
她鼻梁上架着一副钢丝边眼镜。