说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工开挖
1.
Study on Face Deformation and Collapse of Earth Pressure Shield Tunnel;
盾构施工开挖面变形与破坏机理研究
2.
Taking About Method Of Tunnel Excavation In Loessial Region
黄土地区公路隧道施工开挖方法浅谈
3.
Analysis of Structural Stress and Strain of Small Distance Tunnels Excavation by Using Numerical Simulation Method
某小净距隧道施工开挖数值模拟分析
4.
Construction of Dragging Pipe under Complex Condition of Non-excavation
复杂施工条件下非开挖拖拉管的施工
5.
Research on Reverse Circulation Technology of Drill Dregs Removal in Trenchless Technology
非开挖施工中反循环清渣工艺的研究
6.
On the trenchless construction technology of horizontal directional drilling in sewerage projects
排水工程水平定向钻非开挖施工技术
7.
Technique for Deep Pit Construction with No-supported Dig
无支护式明挖扩大基础深基坑开挖施工技术
8.
The brief analysis must excavates the construction technique in municipal administration pipeline construction application
浅析非开挖施工技术在市政管道施工中的应用
9.
Excavation of South Anchorage Foundation Pit of Suspension Bridge of Runyang Bridge
润扬大桥悬索桥南锚碇基坑开挖施工
10.
The Application of Trenchless Technology in Water-supply Pipeline Construction
非开挖技术在供水管道施工中的应用
11.
On Detailed Design of the Pass in and out Openings of Non-excavation Construction Pipeline
非开挖施工管道进出洞口的细节设计
12.
Excavation Construction of the Poor Geological Section in ZhuanBao Tunnel
赚宝隧道不良地质区段开挖处治施工
13.
Excavation and Construction of Extra Large Caverns at Longtoushi Hydropower Station
龙头石水电站特大洞室开挖施工技术
14.
Technical Measures for Safe Excavating of the Upper Portal of the Head-Tunnel in Zhao City
皂市导流洞洞口段上层开挖施工安全技术措施
15.
Measures of controlling directional non-excavating construction crossing building settlement
控制定向非开挖施工穿越建筑物沉降的措施
16.
Construction technical code for underground excavating engineering of hydraulic structures
水工建筑物地下开挖工程施工技术规范
17.
Dewatering is always necessary in foundation pit excavation and hand dig piles.
基坑开挖或施行人工挖孔桩常常需要进行人工降水。
18.
Excavation technology of rock foundation pit in the first station of Yumenkou Huanghe River Lifting Project
禹门口提水工程一级站岩石基坑开挖施工技术