1.
Risk Management and Insurance Analysis of Hydroelectric Cascade Development of River Basin;
流域梯级水电开发中的风险管理及保险分析
2.
Discussion About Power Market and Hydropower Cascade Development of River Basin;
电力市场与水电流域梯级开发问题探讨
3.
Study on Cumulative Effects Assessment of Cascade Hydropower Development in Drainage Area;
流域水电梯级开发累积环境影响评价研究
4.
Research on Water Requirement of CHIBUSU Watershed Ecosystem after Exploitation of Cascade Hydropower Stations;
赤不苏流域梯级电站开发的生态环境需水研究
5.
Research Development of Basin Cascade Hydropower Development and Environment Ecological Protection
流域水电梯级开发与环境生态保护的研究进展
6.
The Environmental Effect Cost Identification and Dynamic Assessment Theory on Hydropower Cascade Development of Basin;
流域水电梯级开发环境影响成本辨识及其动态评估理论
7.
Study on the Exploitation Patterns of Cascaded Hydroelectric and Its Affection on Ecological Environment;
流域梯级水电基本开发模式及其对生态环境影响研究
8.
Risk Management and Insurance Schemes for Basin Cascade Hydropower Development;
论水电及流域梯级开发的风险管理与保险解决方案
9.
Utilizing Remote Sensing to Quantitatively Analyze Impacts of Hydropower Cascade Development on Watershed Vegetation Environment
遥感定量分析水电梯级开发对流域植被环境影响
10.
Huangjinping hydropower station is one of the large-scale step hydropower projects to be developed on Daduhe River recently.
黄金坪水电站是大渡河流域水电梯级近期开发的大型水电工程之一。
11.
Study on Methane Emission of Cascade Reservoirs on Maotiaohe River Basin in summer
猫跳河流域梯级开发水库夏季甲烷排放研究
12.
Impacts of Step Hydropower Development on Ecological Environment in the Liyuan River Basin
梨园河梯级电站开发对流域生态环境的影响
13.
CUMULATIVE EFFECTS OF WATER TEMPERATURE BY CASCADE HYDROPOWER STATIONS BUILT ON UPPER AND MIDDLE REACHES OF THE WUJIANG RIVER
乌江干流中上游水电梯级开发水温累积效应
14.
Discussions on the Unified Price of Electricity Sent into Grid for Cascade Hydropower Stations;
流域梯级水电站统一上网电价的探讨
15.
Landscape Impact and Assessment System Construction of the Small Hydropower Rundle Development in Baisha River Drainage Area;
四川天全白沙河流域小水电梯级开发的景观影响研究与评价体系构建
16.
Soil Erosion Impact and Its Control Planning for the Construction of Hydropower Stations in Huma River Development
呼玛河干流梯级水电站开发项目的水土流失影响与防治
17.
Speeding the Development of the Basin Step Hydroelectric Station and Promoting the Social and Economic Development Continuously
加快开发喀什河流域梯级电站 促进新疆社会经济可持续发展
18.
Speeding the Development of the Basin Step Hydroelectric Station and Promoting the Social and Economic Development Continuously;
加快开发喀什河流域梯级电站 促进新疆社会经济可持续发展