说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大亚湾核电
1.
Unit 1 reactor [Daya Bay Nuclear Power Plant]
第一组核子反应堆〔大亚湾核电厂〕
2.
Interconnection and Safety Control of Information Network of Daya Bay Nuclear Power Plant
大亚湾核电站网络互联及安全控制
3.
The Application of Project Management to Daya Bay Nuclear Power Plant Outage Management;
项目管理在大亚湾核电站大修管理方面的应用
4.
Building Secure and Reliable Supervisory Computer Network for Daya Bay Nuclear Power Plant
构建安全可靠的大亚湾核电站管理计算机网络
5.
GNPS 18-Months Fuel Cycles Core Thermal Hydraulic Design
大亚湾核电站18个月换料堆芯热工水力设计
6.
Republic of Hong Kong shall not procure water or electricity from China.
四.香港共和国不购买东江水及大亚湾核电.
7.
Acceptance Test of Full Scope Simulator of Daya Bay NPP
大亚湾核电站全范围模拟机的验收试验
8.
Localization and Upgrade of KIT/KPS System in Daya Bay Nuclear Power Plant
大亚湾核电站KIT/KPS系统的国产化升级改造
9.
The calculation and transmission of variable's attribute for KIT/KPS system in Daya Bay Nuclear Power Plant
大亚湾核电站KIT/KPS系统变量属性的计算与传递
10.
Localized Transformation of RIC System in Daya Bay Nuclear Power Station
大亚湾核电站堆芯参数测量系统的国产化改造
11.
Design Scheme of 400 kV Line Protection Reconstruction by Daya Bay Nuclear Power Station
大亚湾核电站400kV线路保护改造设计方案
12.
Differences between Reactor Coolant Pumps Used in Qinshan Phase II NPP Project and Daya Bay NPP
秦山核电二期工程主泵与大亚湾核电站主泵的差异及其影响
13.
Analysis and Solutions of Existing Acceleration Protection Problems in 900 MW Unit of Daya Bay Nuclear Power Station
大亚湾核电站900MW核电机组超加速度保护存在的问题分析及对策
14.
Bridge Balance Control of Fuel Handling Machine for Daya Bay Nuclear Power Plant
大亚湾核电站核燃料运输吊车桥架驱动双控制器闭环控制
15.
Identification of Aging and Damage of Neutron Measurement Probe of RPN System in Daya Bay Nuclear Power Station
大亚湾核电站核仪表系统中子测量探头老化和故障鉴别
16.
Feasibility Study on Implementing 18 Months Fuel Cycle Project in Daya Bay NPP
大亚湾核电站实施18个月换料项目的可行性研究
17.
Quality Assessment of the Neighboring Sea Waters Before and After the Operation of the Nuclear Power Station at Daya Bay
大亚湾核电站运转前和运转后邻近海域水质状况评价
18.
Preliminary Study on Improving In?CoreFuel Management Strategy ofGNPS and QNP
秦山和大亚湾核电厂堆芯燃料管理策略改进的初步探讨