说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 贯流泵
1.
Study on CFD Method for 3D Turbulent Flow in Bulb Tubular Pump System;
灯泡贯流泵装置三维湍流CFD研究
2.
Numerical Simulation with the Inlet and Outlet Channels of Two-way Tubular Pumping Station;
双向贯流泵站进出水流道流场数值模拟
3.
Study on Optimizing Flow Pattern of the Inlet and Outlet Conduit of Postpositional Bulb Tubular Pumping System;
后置灯泡贯流泵装置进出水流道流态优化研究
4.
Study on Hydraulic Characteristic and Optimum Design of Pit Tubular Pump System
竖井式贯流泵装置水力特性及优化设计研究
5.
Design and Study of Structure for Large-Scale Gear-Driven Bulb Tubular Pump
大型齿联灯泡贯流泵的结构设计与研究
6.
Numerical simulation and performance prediction for large-scale shaft-well tubular pump unit
大型竖井式贯流泵装置的数值模拟与性能预测
7.
Influence of Supporting Shape on the Hydraulic Performance of Bulb Tubular Pumps
灯泡体支撑件对贯流泵水力性能的影响
8.
Structural Features and Hydraulic Performances Analysis of Various Tubular Pumping Systems
不同型式贯流泵装置结构特点与水力特性分析
9.
Study on start-up transient process simulation of large scale tubular pumping stations
大型贯流泵站机组启动过渡过程仿真计算
10.
Analysis of hydraulic performance and structure for Linjiaba Bulb Tubular Pump Set
蔺家坝灯泡贯流泵机组水力性能及结构分析
11.
Acquisition and analysis of signals in tubular pump pressure pulsation test
贯流泵压力脉动测试信号的采集及处理分析
12.
Study on Parametric Geometry Modeling Method of the Bulb Section of Postpositional Bulb Tubular Pumping System
后置灯泡贯流泵灯泡段参数化几何造型方法研究
13.
Development and Application on Hydraulic Model and Equipment of Bulb Tubular Pumps in the Eastern Route of the South-to-North Water Transfer Project
南水北调东线灯泡贯流泵水力模型及装置研究开发与应用
14.
Hydraulic Vibration Analysis of Bulb Tubular Pump-houses Considering Foundation Radiation Damping
考虑地基辐射阻尼的灯泡贯流泵房水力振动分析
15.
Countermeasure Study on Temperature Control and Crack Prevention of Tubular Pumps During Construction Period
贯流式泵站施工期的温控防裂对策研究
16.
Design of Double-Directions Bulb Type for Water Pump Hydro-Generator/Motor of Jiangxia NO.6 Unit Tentative Tidal Power Station
江厦潮汐试验电站6~#机双向灯泡贯流式水泵水轮发电/电动机设计
17.
Research on Comparation and Selection of the Projects of Bulp Through-flow Pump Sets, and Test of Set-up Model Pump System at Erjiba Pump Station of the South-to-north Water Diversion Project
南水北调二级坝泵站贯流式水泵技术方案比选和装置模型试验研究
18.
" Test methods for centrifugal, mixed flow, axial and regenerative pumps"
GB/T3216-1989离心泵、混流泵、轴流泵和旋涡泵试验方法