说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 330MW机组
1.
An Real-time Analysis of Performance Indexes for the 330MW Unit of Mengda Power Plant;
蒙达发电厂330MW机组性能指标实时分析
2.
Application of the ControlLogix Control System in the Third Issue 2×330MW Units of Shiheng Power Plant;
ControlLogix在石横电厂三期2×330MW机组中的应用
3.
Successive Attempt at Supervision of Capital Construction Process Technology for 330 MW Unit;
330MW机组基建过程技术监督的成功尝试
4.
Experimental research of circulating water treatment optimization for 300 MW unit
330MW机组循环水处理优化试验研究
5.
North-weight characteristics of 330 MW unit and installation process
北重330MW机组的特点及安装工艺
6.
Improvement and Optimization on Thermal Control Signal and Control Circuit in 330 MW Unit
330MW机组热工控制信号、回路优化与改进
7.
FREQUENCY VARYING RETROFIT OF ELECTRIC MOTORS USED FOR CONDENSATE PUMPS OF 2×330 MW UNITS
330MW机组凝结水泵变频改造
8.
Application of Dry Slag Removed System in 330 MW Unit
干式除渣系统在330MW机组中的应用
9.
Design optimization of emergency power supply for flue gas desulphurization in 330MW unit
330MW机组烟气脱硫保安电源的设计优化
10.
Capacity Reducing Modification Scheme for 330 MW Unit Forced Fan Motors and Energy-saving Analysis
330MW机组炉送风机电机降容改造及节能分析
11.
The Optimization Design and Implementation of Coordinated Control System for 330MW Unit;
330MW机组协调控制系统的优化设计与实现
12.
The Research of Energy-saving Potential and Energy-conservation Programmes in Haibowan 330 MW Power Plant;
海勃湾电厂330MW机组节能潜力及节能方案
13.
Calculation and Discussion on the Vent Pipe Strength of Boiler Safety Valve in 330MW Unit
330MW机组锅炉安全阀排汽管道强度核算及探讨
14.
Causation to Fault Close of 330 MW Unit High Pressure Main Stop Valve and its Measure for Solution
330MW机组高压主汽门故障关闭的原因及解决措施
15.
Analysis on DEH System Adjustment Valve Swinging in 330MW Unit & its Treatment
330MW机组DEH系统调门摆动问题的分析处理
16.
Study on Key Technical Measures of Power Generation Restoration for 330MW Units of Jiangyou Power Plant
江油发电厂330MW机组恢复发电关键技术方案研究
17.
The Frequency Converter s Application on Technological Transformation of Energy-saving in DaLaTe Power Plant s 330MW Unit;
变频调速在达拉特发电厂330MW机组节能改造中的应用
18.
2×330MW Project Pre-evaluation Study of Ningdong Guohua Power Company
国华宁东发电有限公司一期2×330MW机组工程项目前期综合评价研究