1.
Slope Stability Analysis and Countermeasures of Intake Diversion Tunnel at the Left Bank of Longtan Hydropower Station;
龙滩电站左岸导流洞进水口边坡稳定分析及防治对策
2.
The Risk and Scheme Analyses of Fast Implementing in the Project of the Left Export Hole at LongTan Hydropower Station;
龙滩水电站左岸导流洞工程快速施工风险及方案分析
3.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
4.
Construction Technology for Transition Section of Diversion Tunnel at Left Bank of Guandi Hydropower Station
官地水电站右岸导流洞进口渐变段施工技术
5.
According to Guo, the height of the dam on the left bank of the Three Gorges will reach 185 meters this year, and the damming of the diversion channel will be completed in November.
郭主任介绍说,三峡左岸大坝今年达185米高程,10月导流明渠截流。
6.
Study on Stability of the Quasi-bedded and Counter-tilt Rock Slope in Right Bank Diversion Tunnel Inlets of Nuozhadu Hydropower Station;
糯扎渡水电站右岸导流洞进口似层状反倾岩质边坡稳定性研究
7.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
8.
Blasting Demolition Technology of Cofferdam at the Entrance and Exit of Right Diversion Tunnel in Jinping Stage I Hydropower Station
锦屏一级水电站右岸导流洞进出口围堰爆破拆除安全技术
9.
Excavation of HF3 and HF & Anti-shear Cavity on the Left Bank of the Laxiwa Hydropower Station
拉西瓦水电站左岸HF3、HF7抗剪洞开挖施工技术
10.
Survey Control in Construction of Long Inclined Shaft
溪洛渡水电站左岸泄洪洞开挖施工技术
11.
The construction of key projects progressed smoothly, including the successful damming of the headrace and the completion of the principal part of the main dam on the left side of the Three Gorges Project; ;
重点工程建设进展顺利。 长江三峡工程导流明渠截流成功,左岸大坝主体工程基本完成;
12.
The construction of key projects progressed smoothly, including the successful damming of the headrace and the completion of the principal part of the main dam on the left side of the Three Gorges Project;;
重点工程建设进展顺利。长江三峡工程导流明渠截流成功,左岸大坝主体工程基本完成;
13.
The river banks were hollowed out by rushing water.
河岸由于流水冲刷而成空洞。
14.
The currents run at approximately 1.5 knots along the northern shore.
沿北岸的潮流速度为1.5海里/小时左右。
15.
Analysis of the results from outside deformation observation and internal anchorage tunnel observation in the high side-slope in the left bank or Wuqiangxi Hydropower Station
五强溪水电站左岸高边坡观测及锚洞内部观测资料分析
16.
Automatic control of long-distance feeding for aggregate storage bin of batching plant on left-bank of Dongping Hydropower Station
洞坪水电站左岸搅拌楼骨料仓远距离进料自动控制
17.
Construction Techniques of The First Stage Open Excavation at Spillway Tunnel Outlet in Left Bank of Xiluodu Dam
溪洛渡水电站左岸泄洪洞出口一期明挖施工技术
18.
Analysis on Stability of Surrounding Rock of Underground Chamber Group on Left Bank Resisting Rock of Jinping-Ⅰ Hydropower
锦屏一级水电站左岸抗力体基础处理洞室群围岩稳定性分析