1.
Study on Face Deformation and Collapse of Earth Pressure Shield Tunnel;
盾构施工开挖面变形与破坏机理研究
2.
Face stability analysis of tunnels with consideration of seepage force
渗透力对隧道开挖面稳定性影响分析
3.
The Analysis of Face Stability in Shield Tunneling on Multi-layer Soil Condition and with Consideration of Opening Area of Cutterhead
多层土及考虑刀盘开口面积的盾构开挖面稳定性分析
4.
Study on Face Stability of Tunnelling Shield in Urban Areas;
城市隧道盾构法施工开挖面稳定性研究
5.
Face Stability Analysis of Tunnel with Consideration of Seepage Condition
渗流条件下盾构隧道开挖面的稳定性分析
6.
Research on Dynamic Balance Mechanism of the Excavation Face with Earth Pressure Shield in Sandy Cobble Ground
砂卵石地层土压盾构开挖面动态平衡机理研究
7.
A Study on Control Tactics of EPBM Excavation Surface Stability and Hydraulic System of Shield
EPBM开挖面稳定控制策略及液压系统研究
8.
Stability Analysis of Tunnel Face Reinforced with Advanced Pipe Grouting
实施超前注浆管棚支护的隧道开挖面稳定分析
9.
Object-Oriented Modeling and Simulation of Spillway Excavation
溢洪道开挖的面向对象建模与仿真
10.
The workmen exposed the gas pipe.
工人们挖开地面使煤气管露出。
11.
The city tore up the street to lay a new water pipe.
该市将路面挖开以铺设一条新水管。
12.
Cost Analysis on the Transport Program for Excavating a Narrow-Bore Tunnel
小型断面隧道开挖运输方案成本分析
13.
The act or ceremony of breaking ground to begin a construction project.
奠基挖开地面以开始一建筑项目的行为或仪式
14.
Applying the technology of smooth blasting, the complete section of the Ⅲ surrounding rock and the half section of the broken and the Ⅱ surrounding rock have been excavated at the obverse step.
利用光面爆破技术,Ⅲ类围岩全断面一次开挖,Ⅱ类围岩和断层破碎带半断面正台阶开挖。
15.
Half the road surface is being taken up to lay new gas pipes.
人们挖开半个路面以铺设新的煤气管道。
16.
Behavior of Pile Foundation during Large-scale Deep Excavation;
大面积深基坑开挖过程中桩基受力特性研究
17.
Excavation Analysis and Research to Underground Caves;
平面应变和三维方法分析洞室开挖问题的探讨
18.
Discussion on Excavation Methods of Shallow-covered Extra-large Cross-section Urban Tunnels
城市浅埋超大断面隧道的开挖方法探讨