1.
Differential Settlement Analysis and Compaction Standard Research of Cut-fill Roadbed;
填挖交界路基差异沉降分析及压实标准探讨
2.
Development of Auto-Tracing Dividing Line of Earthwork Based on CASS
基于南方CASS的挖填方0界线自动追踪
3.
balanced earthworks
填挖平衡的土方工程
4.
The enclosed area is filled only if that imaginary line crosses an odd number of boundary lines.
封闭区域只在如果想象的线与边界线的奇数数量交叉时才被填充。
5.
dual-3 shallow cut and cover tunnel
双程三线明挖回填式隧道
6.
Numerical Simulation Research of Construction of the Semi-filled and Semi-excavated Embankment;
半填半挖路堤施工过程数值模拟研究
7.
The form is to be filled in and returned within three weeks.
请于三周内将表填好并交回来.(填表)
8.
West Kowloon Reclamation Traffic Study
西九龙填海区交通研究
9.
Section E Listen to the job interview. Fill in the card.
听招聘面试交谈,填卡片。
10.
Upon completion of your payment, please proceed to fill out the GRE online registration form and submit it.
完成交费的考生,请填写好报名表,填好后提交。
11.
The Construction of High Fill and Deep Cut Soil Subgrade
高填深挖土质路基施工——离军高速十三标段路基填筑施工总结
12.
To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.
为了降低土方工程的费用,填方量应等于挖方量。
13.
Excavation and Fiu of Stonework of High Grade Highway in Mountainous and Hiuy Terrain
山岭重丘区高等级公路石方开挖与填筑
14.
Study on Stability Mechanism for Half Filling and Half Digging Roadbed Slope;
半填半挖路基边坡稳定性力学机理研究
15.
Stability Analysis Method for Half Filling and Half Digging Roadbed in Mountain Area;
山区公路半填半挖路基稳定性分析方法
16.
Finite Element Analysis of Geocell Dealing with Half-Filled and Half-Dug Road;
土工格室处治半填半挖路基的有限元分析
17.
Seismic fortification for high-filled embankment slope or deeply digging side road cutting slope
高填方路基边坡或深挖方路堑边坡抗震设防
18.
Analyzing and Comparing the Methods of Digging and Filling Road Bank in Silt
在淤泥中大面积开挖及填筑路堤的方法探讨