说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 贯通导线
1.
Determination of Additional Survey Location of the Gyrostatic Orientation Line in Traverses
贯通导线中加测陀螺定向边位置的确定
2.
The whole railway line has been joined up.
这条铁路已全线贯通。
3.
Study of Helmert Variance Component Estimation in Tunnel Run-through Control Traverse Difference
Helmert方差分量估计在隧道贯通中控制导线平差的研究
4.
Control Measurement and Hole-Through Survey within Parallel Adit of No. Ⅱ Line in Qinling Extra-Long Tunnel
秦岭特长隧道Ⅱ线平导洞内控制测量和贯通测量
5.
Impact of Conductor Penetrating Shielding Box via Apertures on Inside Circuit of Control System
控制系统中导线贯通屏蔽箱体对内部电路的影响
6.
After the entire project is completed in 2005, gas will be transported from the Tarim Basin.
2005年全线贯通,开始送塔里木气。
7.
Design of Railway Station Monitoring System on Automatic Blocking Lines(Continuous Transmission Lines)
铁路自闭线(贯通线)站点监控系统的设计
8.
The Implementation of ″Health Is First″ Guiding Ideology in P. E. Teaching in Colleges and Universities;
普通高校体育教学要贯彻“健康第一”的指导思想
9.
Development of the Location Device for the Fault Section of the Railway 10kV Transmission/automatically Blocked Line;
铁路10kV贯通、自闭线故障区段定位装置的研制
10.
Fault Location on Railway Power Lines Using Travelling Wave Transients;
铁路电力自闭/贯通线路行波故障测距技术
11.
Study on Fault Distance Measurement Methods in 10kV Automatic Blocking and Continous Transmission Lines;
10kV铁路自闭贯通线路故障测距方法研究
12.
Study on Travelling Wave Fault Location of Railroad Automatic Blocking/Power Continuous Lines;
铁路自闭/贯通线路行波故障测距的应用研究
13.
Research on FTU of 10kV Railway Power Supply Line;
10kV铁路贯通/自闭线的智能控制器FTU的研制
14.
Design and Application of Railway Power Transmission Lines/Automatic Blocking Line Remote Control System
铁路电力贯通/自闭线路远动系统的设计及应用
15.
Research on the Design of Low Resistance Grounding System for Entire Cable Power Line along the Railway
全电缆贯通线低电阻接地系统的设计研究
16.
Frequency Spectrum Characteristic Analysis of Single-Phase Grounding Fault in Railway Continuous Power Line
铁路贯通线路单相接地故障频谱特征分析
17.
Study on the Plans for Compensation and Earthing of Power Cable through Line of Shijiazhuang-Taiyuan PDL
石太客运专线电缆贯通线路补偿和接地方案研究
18.
This question of the leading groups has a bearing on whether or not the Party line will be implemented.
领导班子问题,是关系到党的路线能不能贯彻执行的问题。