说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 梁体预制
1.
Quality Control Measures in Beam Prefabrication under High Temperature
高温条件下梁体预制混凝土施工质量控制措施
2.
The upwarp control measures of mass concrete prefabrication box beam
大体积混凝土预制箱梁上拱控制措施
3.
This erector integrates the conveying, hoisting and installing of the bridges to ensure the bridge erecting operation is efficient and safe.
该架桥机能使运梁、送梁和梁的安装一体化,高效、安全地完成混凝土预制梁的架设。
4.
precast prestressed concrete beam
预制预应力混凝土梁
5.
The Co-Affect Analysis of Bridge Deck and Precast Beam
桥面整体化层与预制梁共同工作性能研究
6.
DEFLECTION CONTROL OF REINFORCED CONCRETE BEAMS STRENGTHENED WITH EXTERNAL TENDONS
体外预应力加固配筋混凝土梁的变形控制
7.
Installation and System Conversion of 60 m Precast Box Girder of Jintang Bridge
金塘大桥60m预制箱梁的安装与体系转换
8.
Essentials of Quality Control in Entire Precast Construction of Qingdao Bay Bridge 60m Prestressed Concrete Box-girder
青岛海湾大桥60米预应力混凝土箱梁整体预制施工质量控制要点
9.
Key Points of Construction Quality Control of Precasting 60-m Full Span PC Box Girders for Qingdao Bay Bridge
青岛海湾大桥60m预应力混凝土箱梁整体预制施工质量控制要点
10.
Beixiang beam line factory 32 m whole bore box beam preparing technique
北乡制梁场32m双线整孔箱梁预制技术
11.
Research on the Related Problems in Design of Precast Segmental Concrete Bridges with External Tendons;
预制节段体外预应力混凝土梁桥设计中有关问题的研究
12.
Study on the Mechanical Characteristics of Precast Segmental Concrete Box Girders with External Tendons;
预制节段拼装体外预应力混凝土箱梁受力特性研究
13.
precast beam and hollow-tile floor
预制小梁空心砖楼盖
14.
Mechanical Analysis for Prefabrication Stage of Prestressed Concrete T Beams on Bridge
桥梁中预应力混凝土T形梁预制阶段力学分析
15.
The box girders were to be precast units, bonded together in place at the joints with an epoxy resin.
箱梁采用预制构件,在现场连接处涂以环氧树脂,以粘结成为整体。
16.
Vibration Control of Pre-stressing Reinforcement in Design of Out-body Pre-stressing Reinforcing of Highway Bridge
公路桥梁体外预应力加固设计中力筋的振动控制
17.
EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF PRE-CAST CONCRETE BEAM-COLUMN SUB-ASSEMBLAGE WITH CAST-IN-SITU MONOLITHIC JOINT
预制混凝土结构后浇整体式梁柱节点抗震性能试验研究
18.
Post-tensioning Producing Method of the Prefabrication of 40 m Prestress Box
后张法40m预应力箱梁预制施工技术