说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小浪底水电厂
1.
Optimal Design of Xiao Langdi Hydraulic Power Plant Computer Supervision System;
小浪底水电厂计算机监控系统优化设计
2.
Project claim and claim processing during construction of Xiaolangdi Water Control Project on Yellow River;
黄河小浪底水利水电工程索赔及其处理
3.
Study on Methods Used for Analyzing Adjoining Rock Stability of Underground Hydroplant in Xiaolangdi Project
对黄河小浪底水利枢纽地下厂房围岩稳定性分析方法的研究
4.
Research on Temperature Control Scheme of Foundation Slab for Powerhouse of Small-scale Hydropower Plant
小型水电站厂房主机间底板温控方案研究
5.
Handling of Dispute for Imported Turbine Supply Contract in Xiaolangdi Water Power Station;
小浪底水电站进口水轮机供货合同争议的处理实践
6.
Experiments of Anchorage and Shotcrete Support and Quality Control for the Tailwater Canal of Xiaolangdi Hydropower Station
小浪底电站尾水渠喷锚支护试验及施工质量控制
7.
Mechanical Tests of Block Media in the Underground Plant Chambers of the Xiaolangdi Multi-Purpose Dam Project──Effect of Prestressed Anchorage Cable Supports
黄河小浪底水利枢纽工程地下厂房洞室群块体介质力学模型实验──预应力锚索支护效果
8.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
9.
Regulation of density flow routing of Xiaolangdi reservoir in Yellow river
浅析黄河小浪底水库异重流演进规律
10.
A Crucial Project for Harnessing the Yellow River:Xiaolangdi Multi-purpose Dam Project
治理黄河的关键工程——小浪底水利枢纽
11.
Summary on the Assembly Technology of Generator Stator Core in Xiaolangdi Power Station
小浪底发电机定子铁心装配工艺总结
12.
Study of Pressure Control Methods Through Impounding Water for the Gates of the Xiaolangdi Reservoir;
小浪底水利枢纽水工闸门充水平压方式研究
13.
Influence of Xiaolangdi Reservoir Impoundment on the Precipitation in Reservoir Area and Surrounding
小浪底水库蓄水对库区及周边降水的影响
14.
Fog Days Variation Characteristics of Xiaolangdi Reservoir Before and After Impoundment
小浪底水库蓄水前后库区雾日变化特征
15.
Influence of Climate Change on Ecology and Agriculture After Xiaolangdi Reservoir Sluicing
小浪底水库蓄水后气候变化对生态、农业的影响
16.
Xiaolangdi Reservoir on the Yellow River:technologies and equipment for deepwater sediment treatment
黄河小浪底水库深水泥沙处理技术与装备构想
17.
Retrospection and consideration on the resettlement of Sanmenxia and Xiaolangdiprojects in the Yellow River
三门峡、小浪底水利枢纽移民安置的回顾与思考
18.
Sidelights on the first successful experiment with water and silt regulation at the Xiaolangdi key water-control project on the Yellow River
黄河小浪底首次成功调水调沙试验侧记