1.
Welding technology conclusion of 3R55 dome pipes in Ling'ao 2 period nuclear power plant
岭澳二期核电站3R55穹顶管道焊接技术
2.
Discussion on Quality Assurance Classification Management in Guangdong Ling ao Phase II Nuclear Power Project;
广东岭澳二期核电工程质保分级管理的探讨
3.
Research on Modeling Conventional Island of Lingao Phase Ⅱ Nuclear Power Plant Thermal-Hydraulic System
岭澳二期核电站常规岛热力系统建模分析与研究
4.
Application of Digital Technology and Its Engineering Adaptation in Reactor Control System in Ling’Ao Phase II NPP
岭澳二期反应堆控制系统数字化技术应用及其工程适应性研究
5.
Technical Improvement of ATE System of Ling’ao Nuclear Power Plant PhaseⅡ
岭澳核电站二期凝结水处理系统重大技术改进
6.
Analysis of Turbine Fire Protection System of Ling’ao Nuclear Power Plant Phase II
岭澳核电站二期汽轮发电机轴承消防系统分析
7.
Construction Technology of Safety Shell Prestress in Ling'ao Nuclear Power Station Phase Ⅱ
岭澳核电站二期核岛安全壳预应力施工技术
8.
Project Management Mode Selection & Actualizing Strategy Analysis of LingAo Nuclear Power Project Phase II;
岭澳核电站二期工程项目管理模式选择及实施策略分析
9.
The Control and Improvement of FAC in LingAo II Feedwater Pipe Work
岭澳核电站二期给水管道流动加速腐蚀的控制与改进
10.
STUDY ON LOCALIZATION OF MANUFACTURE OF UNDERRELAXATION PRESTRESSED STEEL SHANDS FOR CONTAINMENT OF Ling'ao NUCLEAR POWER PLANT (PHASE-Ⅱ) AND ITS USE
岭澳核电二期核岛安全壳低松弛预应力钢绞线国产化研究及应用
11.
Design Optimizations for Conventional Island for Ling'Ao Phase II Nuclear Power Plant
岭澳核电站二期工程常规岛主厂房布置设计优化
12.
Study on the Cost Management in the Second Expansion Project of Power Plant of Tieling;
铁岭电厂二期扩建工程费用管理研究
13.
Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station
岭澳核电三期强风化角岩边坡岩体直剪试验研究
14.
On the establishment of Australia-America’s military alignment during the Second World War;
论二战期间澳美军事同盟关系的建立
15.
“Bennetts Green” won “Macau Futurity Trophy” held on Saturday, 10 November 2007.
「澳洲情怀」勇夺二○○七年十一月十日(星期六)第九场「澳门新星锦标」。
16.
Study on CO_2 Reservoir-forming Periods in Changling Fault Depression of Southern Songliao Basin
松辽盆地南部长岭断陷二氧化碳成藏期次
17.
The Dalai Lama arrived in Australia Tuesday for a 10-day visit.
达赖喇嘛星期二抵达澳大利亚进行为期10天的访问。
18.
Discussing of Project Management Model in Lingao Nuclear Power Station;
岭澳核电站工程项目管理模式的探讨