1.
The sixth large-scale speed-up and diagram adjustment in the nationwide railway infrastructure technological innovation for 200 km/h trains;
中国铁路第六次大面积提速调图200km/h速度级固定设施技术创新
2.
Research on the Speed Matching of Passenger/Freight Trains on Existing Liens with Max. Speed of 200km/h
200km/h既有线客货列车速度匹配研究
3.
The Speed Match Plan of Passenger/Freight Trains with the Elevated Speed at 200km/h on the East Longhai Line;
东陇海线200km/h提速后客货列车速度匹配方案研究
4.
Study on the Integrality Driving System Scheme of the Locomotive at 200km/h Speed;
200km/h等级机车整体驱动系统方案研究
5.
200km/h High-Speed Passenger Car Body Optimum Design;
200km/h高速客车车体优化设计
6.
A Preliminary Research on 200km/h C_0-C_0 High-speed Iocomotive Bogie;
C_0-C_0轴式200km/h高速机车转向架方案预研究
7.
Tentative ideas of supplementary norms making for railway projects with a speed of 200 km/h;
时速200km/h铁路工程补充定额编制的初步设想
8.
Research on the Structure of 200km/h Electric Locomotive Bogie Frame;
200km/h电力机车转向架构架结构强度研究
9.
Optimization Study on Welding Sequence of Side Beam of Welded Frame in 200km/h High-speed Powered Car Train-set;
200km/h高速动车组焊接构架侧梁焊接顺序优化研究
10.
Strength Test and Finite Element Analysis on Frames of Powered Bogies for 200 km/h Intercity Multiple Units
200km/h城际动车组动力转向架构架强度试验及有限元分析
11.
Research on 200km/h Electric Locomotive s Auxiliary Inverter;
200km/h电力机车辅助逆变器研究
12.
Electric-Pneumatic Braking System Technology Research for 200km/h Train;
200km/h列车电空制动系统技术研究
13.
Manufacture and Testing for the 200km/h Power Measured Train;
200km/h动力综合检测车的研制与试验
14.
The Development and Investigation on High-Speed Bogie of 200km/h AC Electric-Locomotive;
200km/h交流电力机车转向架开发研究
15.
Study on Security of 200km/h High Speed EMU Severing in Crosswind;
横风作用下200km/h动车组安全性研究
16.
Research on Structure of Body Bolsters for 200 km/h Track Inspection Cars
200km/h轨检车枕梁结构研究
17.
Discussion on Modular Design for Baggage Rack of 200 km/h Multiple Unit
200km/h动车组行李架模块化设计探讨
18.
Design of Air-Conditioning System for 200 km/h Track Inspection Car
200km/h轨道检测车空调系统设计