1.
Cavitation Behaviour Forecast of Hydraulic Turbine Runner of the Wanjiazhai Water Power Station;
万家寨水电站水轮机转轮空化性能的预测研究
2.
Discussion on the construction quality management of the powerhouse of Wanjiazhai hydropower station
浅议万家寨水利枢纽电站厂房施工质量管理
3.
The Choice of High Voltage Fuse Protectors in Wanjiazhai Hydroelectric Power Plant
万家寨水电厂高压限流熔断器保护装置的选用
4.
The Review and Expectation about the Technical Alteration of Hydraulic Generator in Wangjiazhai Hydraulic Power Plant
万家寨水电厂水轮发电机组技术改造回顾与展望
5.
Cause analysis of the governor system and its countermeasure for Wanjiazhai hydraulic power station
万家寨水电厂调速器系统频繁故障原因分析及对策
6.
The Thought of the Poetical Works Shui Diao Ge Tou the Projectof Drawing Yellow River in Wan Jia Zhai;
《水调歌头·万家寨引黄工程走笔》发微
7.
Construction Supervision System During Yellow River Wanjiazhai Water Control Project;
黄河万家寨水利枢纽工程的建设监理
8.
On Planning of Regulation Reservoirs in North Main Line of YRDP
万家寨引黄北干线调节水库规划问题
9.
Quality Test and Defect Treatment of Concrete at Pressurized Outlet Adit and Shaft of Pumping Station,The YRDP
山西省万家寨引黄工程地面泵站出水压力平洞、竖井混凝土质量检测及缺陷处理
10.
The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed.
文中针对万家寨引黄工程输水隧洞及泵站平洞竖井存在的渗漏原因进行分析研究。
11.
The Water Price Analysis of Water Supply from The South Main Line of YRDP to Jinzhong Plain Region;
万家寨引黄南干线向晋中平川区供水水价分析
12.
Research on Reform of Water Price in Taiyuan Water Supply Area of Wanjiazhai YRDP;
万家寨引黄工程太原供水区水价改革研究
13.
Speculation on Water Price Reform of Water-supply Area of the YRDP,Wanjiazhai;
关于万家寨引黄工程供水区水价改革的思考
14.
The Water Quality Real-time Monitoring System of Wanjiazhai YRDP(Yellow River Delivery Project)
万家寨引黄工程供水水质实时监测系统初探
15.
Test Analysis on Blasting Vibration in Dam Foundation Excavation of Wanjiakouzi Hydropower Station
万家口子水电站坝基开挖爆破振动试验分析
16.
The analysis and treatment of the landslides on left bank of entrance of Wanjiakou Hydropower station
万家口水电站左岸进场路滑坡的分析及处理
17.
The Hydraulics Computer Simulation of Shanxi Wanjiazhai Yellow River Diversion project;
山西省万家寨引黄工程水力学仿真计算研究
18.
Running Analysis Research on the Hydraulic Measure System of Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程水力量测系统运行分析研究