说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡左岸电站
1.
Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant
三峡左岸电站VGS机组推力轴承分析
2.
Technical Characteristics of the Stator Bar Main Insulation of Generators in the Three Gorges Left Bank Power Station
三峡左岸电站发电机定子线棒主绝缘技术特点
3.
Study on Dynamic Testing and Characteristics of Three Gorges Left Powerhouse;
三峡左岸电站厂房动态测试及动力特性研究
4.
Influence of Negative Discharge on Vibration of ALSTOM Units on the Left Bank of the Three Gorges Hydropower Station
负流量对三峡左岸电站ALSTOM机组振动的影响
5.
Causes of high temperature of VGS unit's thrust bearing in left bank power station and improvement measures
三峡左岸电站VGS机组推力瓦温偏高及改善措施
6.
Preliminary analysis on abrasion of turbine's flow parts of TGP's power station on left bank
三峡左岸电站水轮机过流部件磨蚀初析
7.
3-D FEM Emulation Computation on Surrounding Concrete of Steel Spiral Case Keeping Internal Pressure During Construction for TGP
三峡左岸电站蜗壳保压浇筑外围混凝土仿真计算
8.
Some Technical Problems of Excitation Rectifier Transform ers of Hy droelectric Generator of Left Shore Power Station in Three Gorges Project
三峡工程左岸电站水轮发电机励磁整流变压器的几个技术问题
9.
Research on the Abnormal Vibration of Unit 6 of the Three Gorges Left Bank Station under Small Guide Opening Conditions;
三峡电站左岸6号机组小开度工况异常振动研究
10.
The Rigidity and Strength Analysis on Hydraulic Turbine Runner of the Three Gorges Power Station(Right Bank)
三峡电站(右岸)水轮机转轮刚强度分析
11.
Features of the Alarm Mechanism of Computer Supervisory System of Three Gorges Right Bank Power Station
三峡右岸电站监控系统报警机制特点
12.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
13.
Function Design and Implementation of AVC in Three Gorges Right Bank Hydropower Station
三峡右岸电站AVC功能设计及实现方法
14.
Electric braking on the right bank of the Three Gorges power station on the relay the impact of downtime
三峡右岸电站电气制动停机对继电保护的影响
15.
Analysis and improvement of generator-transformer protection of Three Gorges Right Bank Hydropower Station
三峡右岸电站发电机变压器保护分析及改进
16.
Brief analysis on shaft axis alignment of DFEM hydropower unit in Three Gorges Right Bank Hydropower Station
三峡右岸电站东电机组轴线调整简要分析
17.
Analysis of main circuit resistance of 500kV GIS in Three Gorges right-bank plant
浅析三峡右岸电站500kV GIS主回路电阻问题
18.
Researches on Rock Fragmentation Optimum of Blasting Parameter at the THREE GORGES Project Right Hydro Station;
三峡工程右岸电站岩石爆破参数优化研究