说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 电价分区
1.
A fuzzy clustering method for price partition based on the sensitivity of node price;
基于节点电价灵敏度模糊聚类的电价分区方法
2.
Study on Scheme of Electric Supply for Voltage Grading & Network Partition and Index Algorithm;
电网分层分区供电方案及评价指标算法的研究
3.
The Security Assessment and Reliability Analysis of the Langfang Power System;
廊坊地区电网安全评价与可靠性分析
4.
Differentiation evaluation on regional suitability of crop straw resources utilization in China
中国秸秆生物质发电区域适宜度分异评价
5.
Killing effect of rodents in parts of large reservoirs region in Guangxi Zhuang Nationality autonomous region
广西部分大型水电站库区灭鼠效果评价
6.
A CPP Policy Based on Dynamic Zone Pricing of Power Grid
基于电网动态分区定价模型的邮路策略
7.
Analysis and Evaluation of Surge Wave Caused by Accumulation Body Failure in Reservoir Area near the Dam
某水电站近坝库区堆积体坍岸涌浪分析与评价
8.
The Assessment and Zonation of Regional Crustal Stability in the Dagangshan Hydropower Station of the Dadu River
大渡河大岗山水电站区域地壳稳定性分区与评价
9.
Research on Comprehensive Evaluation Index-System and Awarding Distribution for Plants-corporation in Areal Electricity Market;
发电集团参与区域电力市场竞价考评与奖励分配机制研究
10.
Research on Electricity Price Decision Making in Power Supply Market and Implementation of Decision Support System;
地区供电市场电价风险分析及其决策支持系统研究开发
11.
Bidding Behavior Analysis and Forecast of Generation Enterprises in Monthly Electricity Market of Southern China Power Grid;
南方区域月度电力市场中发电企业的报价行为分析与预测
12.
IMPLEMENTATION AND ANALYSISOF TRANSMISSION SERVICES MARGINAL PRICING IN A MULTI-AREA INTERCONNECTED POWER SYSTEM;
多区域互联电力系统输送服务边际电价的实现和分析
13.
Application of Time-of-use Power Price in High Energy Consumption User of Wulanchabu Area;
分时电价在乌兰察布地区高载能用户中的应用研究
14.
SOCIAL COST-BENEFIT ANALYSIS AND POLICY ASSESSMENT FOR GRID-CONNECTED SOLAR PHOTOVOLTAICS SYSTEM DEVELOPMENT IN WESTERN PART OF CHINA;
西部地区发展并网光伏发电系统的社会成本效益分析与政策评价
15.
Innovation's Performance Evaluation of Northeast China's Electronics Information Industry Based-on Factor Analysis
基于因子分析的东北地区电子信息产业创新绩效评价
16.
The Analysis of Influence Complication (s) and Rat-killing Effect in the Yellow river SuZhi Power Plant Submerse Area
黄河苏只水电站淹没区灭鼠效果评价及影响因素分析
17.
Evaluation and Analysis on the Influence of the Area of the Ash Field on the Quality of Water Environment
电厂贮灰场区域对地下水环境质量影响评价分析
18.
Comprehensive Post-Evaluation Method of Power Network Renovation Project Based on Fuzzy Interval Evaluation and Analytic Hierarchy Process
模糊区间评价与层次分析相结合的电网改造项目综合后评估方法