说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 既有地铁
1.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
2.
On analysis of shield construction through existing subway in running tunnel
盾构施工下穿既有地铁区间隧道分析
3.
Influence Analysis of Safety Operation of New Metro Affect Exist Metro in Metro Crossing Engineering
地铁穿越工程中新建地铁对既有地铁安全运营的影响分析
4.
Construction Technology of the Integration Turnout on Monolithic Track Bed of Existing Metro Line
既有地铁整体道床线路接轨道岔施工技术
5.
STUDY ON ALTERATION MEASURES OF SMOKE MANGAGEMENT SYSTEM IN BEIJING METRO
北京既有地铁防排烟系统改进措施研究
6.
Numerical Simulation Analysis for Influence of Overhead Excavation on Existing MTR
基坑开挖对下方既有地铁影响数值分析
7.
Numerical Simulation of Shield Tunnel Passing under the Existing Subway Station
盾构隧道近接下穿既有地铁车站的数值模拟
8.
INFLUENCE OF EXISTING SUBWAY LOAD ON GROUND SETTLEMENT INDUCED BY UNDERGROUND EXCAVATION OF BEIJING SUBWAY DIAMETER LINE
既有地铁荷载对北京地下直径线开挖地表沉降影响
9.
Research on the Key Technology and Experience of Shallow Tunneling Method Crossing under the Existing Subway Tunnel;
浅埋暗挖下穿既有地铁构筑物关键技术研究与实践
10.
Research on Construction Technology of Large Section Tunnel Crossing under the Existing Subway Tunnel by Means of Shallow Tunneling Method;
大断面隧道浅埋暗挖法下穿既有地铁构筑物施工技术研究
11.
Study on Deformation Influence & Control of up Crossing Engineering Acting on the Existed Metro Tunnel Structure;
上穿工程对既有地铁隧道结构变形影响及控制研究
12.
Renovation of Dangerous Bridges on the Local Narrow Track Railway
既有窄轨地方铁路危桥整治方案研究
13.
A summary of research on subway construction approaching existing foundations
地铁临近既有基础情形施工研究综述
14.
On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station
浅埋暗挖地铁车站地表沉降及既有线变形分析
15.
Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing;
地铁新线车站穿越既有线车站的施工力学分析
16.
Actuality Evaluation and Repair on Tunnel Structure of Existing Underground in Tianjin;
天津市地铁既有线隧道结构现状评估及治理
17.
The Comprehensive Technique to Protect the Existing Bridge at the Project of Guomao Subway Station;
国贸站地铁工程中对既有桥梁的综合保护技术
18.
Study on Construction Technique of Metro Station Driven with Enlarging the Existing Shallow Air Defense Tunnels
浅埋既有人防隧道扩挖地铁车站施工技术研究