1.
The lower portion of a pier may be widened to Better distribute the downward pressure of a massive overlying structure.
若加宽墩的下部,能更好地分配来自于上部建筑结构的压力。
2.
The second temporary pier was such that its legs straddled the width of the pier.
第二临时墩的立柱间距超过桥墩的宽度。
3.
The Research on Extent of Turbulence Zone Around Pier and Width of Navigable Bridge Opening;
桥墩周围紊流区宽度及桥梁通航孔净宽研究
4.
Numerical Simulation on United System of Flaring Gate Peers, Stepped Spillway and Stilling Pool;
宽尾墩和阶梯溢流坝一体化数值模拟
5.
Research on Hydraulic Characteristics of Different Faring Gate Piers;
不同体型宽尾墩的水力特性比较研究
6.
Experimental study of lateral turbulent flow width at round-ended pier
圆端形桥墩侧向紊流宽度的试验研究
7.
Optimal experimental study on flaring piers of surface spillways in high arch dam
高拱坝表孔宽尾墩体型优化试验研究
8.
Experimental Investigation on Width of Superficial Eddy Area around Cylindrical Pier
墩柱周围水流表层涡漩区宽度的试验研究
9.
Study on Combined Energy Dissipator with X-Shape Flaring Gate Pier in Shatuo Hydropower Station;
沙沱水电站X型宽尾墩联合消能工的研究
10.
Experimental Study of Turbulent Flow Width and the Characteristic of the Turbulence Around Round-ended Pier
圆端形桥墩周围水流紊动特性及紊流宽度研究
11.
The Construction Technology of the Dam Flaring Piers by Using Slip-forms of Jufudu Hydropower Project
居甫渡水电站大坝宽尾墩滑模施工技术
12.
Study test on combined energy dissipator of flaring pier and flip bucket
T型宽尾墩+消力戽(池)联合消能工试验研究
13.
Application of new type flaring gate pier at Lidi hydropower project
新型坎式宽尾墩等在里底水电站中的应用研究
14.
Application and understanding of flaring gate pier joint energy dissipater with low-middle water head
中低水头宽尾墩联合消能工的应用与认识
15.
Skimming Flow Pressure Characteristics on Joint Energy Dissipation of Stepped Dam-face & Flaring Gate Piers
与宽尾墩联合使用的台阶面水流压强特性研究
16.
Test and Study of Influence of Length of a Flaring Pier Plunge Pool on Energy Dissipating Effect
宽尾墩消力池池长对消能效果影响的试验研究
17.
Experimental Investigation on Energy Dissipation by Flaring Gate Piers on Spillways and Slit-Type Bucket on Bottom Level Outlets in High Arch Dams;
高拱坝表孔宽尾墩—深孔窄缝挑坎联合消能试验研究
18.
Aeration of skimming flow on stepped spillway combined with flaring gate piers
与宽尾墩联合使用的阶梯溢流面水流掺气问题研究